A NEW GENERATOR THAT CAN DRIVE DOWN LCOE INNOVATION
GreenSpur Renewables has developed a new low cost direct drive (DD) permanent magnet generator (PMG) for the wind turbine market. The company’s USP is that its generator uses ferrites to create the magnetic field, which is a significant source of cost reduction. The use of ferrite could also eliminate an industry wide reliance on Neodymium Iron Boron (NdFeB), the scarce and expensive rare magnet used in existing designs.
RARE EARTH MAGNETS INTRODUCE SUPPLY AND PRICE RISKS
Security of supply of NdFeB is a major risk issue. Almost 95% of global rare earth market production originates from China and is in high demand from other powerful industries, including defence, aerospace, electrical vehicles, medical, computing and mobile phones. The 2015 annual production of neodymium amounted to 35,900 tonnes.
By contrast ferrite magnets are made
from iron ore, an abundant material with worldwide reserves estimated at 800 billion tonnes. NdFeB is also expensive. Although ferrite magnets are 1/3rd less
The Greenspur DD PMG has been proven at prototype scale. A Finite Element Analysis model has been built by the University of Cambridge, which can
MORE INFO REPORT PLAY VIDEO
powerful they are 1/30th of the cost by mass of rare earth magnets. In simple terms magnet costs could fall to 1/10th of current levels and simultaneously eliminate supply risk.
WHAT’S DIFFERENT?
The Greenspur DD PMG is a patented novel axial flux design. It embodies a number of innovations that make it possible to assemble a ferrite only DD PMG with a similar mass and space envelope to current offerings. It is also less sensitive to the cooling problems that face existing DD PMGs, as ferrite has a Curie point of 460°C as compared to 180°C for NdFEB magnets.
COST ADVANTAGES
LCOE savings of about 0.5% have been estimated by BVG Associates and there is potential to go much further as the design is optimised.
DEVELOPMENT PATH SCAN/CLICK SCAN/CLICK SCAN/CLICK
accurately model output and costs of multi-MW units. A 50kW unit will be in test by the end of the year. The company then plans to build an optimised 250kW unit, which will be quickly followed by a fully optimised 1MW unit. This will provide the stepping stone to much larger units in the 6MW to 15MW range suitable for deployment from the early 2020s onwards. The company is looking to establish relationships with leading suppliers that will guide designs suitable for volume manufacture.
Greenspur
68
www.windenergynetwork.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82