INDUSTRY NEWS
THE BEACH GOT BIGGER
EEEGR member Gee-Force Hydraulics, specialist supplier of controlled bolting and flange working equipment has moved to new, larger premises on the prestigious Beacon Business Park in Great Yarmouth.
THE BEACH GOT BIGGER
‘The Beach Got Bigger’ was the company’s strapline whilst exhibiting at EEEGR’s SNS2016 event earlier this year when the company made the announcement about a new rental and training partnership with industry leader HTL. The ‘beach’ is of course local vernacular for ‘onshore’ and a previous strapline ‘the beach got closer’ signified the company’s presence in Great Yarmouth, right at the heart of the Southern North Sea oil & gas operations. The new partnership offers access to an unparalleled hire fleet of controlled bolting and flange working equipment, flushing, test and instrumentation equipment, portable machines as well as cutting and subsea equipment.
The partnership also brings ECITB approved training and testing from the new Beacon Park premises. HTL’s team of industry experienced technical trainers ensures that Gee-both companies can continuously deliver approved courses which meet local customer needs, including the new Wind Turbine Bolted Connections courses, MJI31 and MJI32.
COMPLETE PORTFOLIO OF SOLUTIONS
Managing Director Graeme Cook explained: “Gee-Force Hydraulics already supply controlled bolting and flange working equipment to a wide range of industry sectors including oil & gas, power generation and renewable energy, however a partnership with HTL allows us to offer customers a complete
WITH THE NEW
PREMISES, A MUCH WIDER RANGE OF EQUIPMENT IS READILY AVAILABLE
portfolio of solutions through a full range of hire equipment. In discussions with HTL we felt that a partnership could bring about an unrivalled level of customer service to the local area, which has already been enthusiastically received by our customers. “With the new premises, a much wider range of equipment is readily available on our hire shelves as well as a full training calendar filled with courses in demand from industry; the beach has certainly got bigger!”
Gee-Force Hydraulics
4
www.windenergynetwork.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82