A
VIEW FROM SHORE LANDING TOWARDS SUBSTATIONS OPTION 1 FENCE GL B TEMP DRAIN TEMP DRAIN TEMP DRAIN TEMP DRAIN
SUBSOIL STOCKPILE
EA1 CC1
EA1 CC2
26500 TOPSOIL STRIP 21130 PERMANENT EASEMENT
TEMPORARY ACCESS ROAD
TEMPORARY FOOTWAY EA3 GL B
TOPSOIL STOCKPILE
FENCE
A
1000 1500 C
1000
1000
7000 12000
1000
2000
1000
MIN.5000 6000
1000
2000 3500 44500 CONSTRUCTION SWATHE
2000 3750
5500 3750
2000 3500
5000
1000 9000
4000
1000
1000
1000 1500 C
VIEW FROM SHORE LANDING TOWARDS SUBSTATIONS OPTION 2 26500 TOPSOIL STRIP D FENCE GL
SUBSOIL STOCKPILE
EA1 CC1
12630 PERMANENT EASEMENT
EA1 CC2
TEMPORARY FOOTWAY EA3
TEMPORARY ACCESS ROAD
GL
TOPSOIL STOCKPILE
FENCE D
TEMP DRAIN
TEMP DRAIN
TEMP DRAIN
E 1000 1500 1000 1000 7000 12000 1000 2000 1000 MIN. 5000 6000 1000 MIN.5000 6000 44500 CONSTRUCTION SWATHE 1000 2000 3500 2000 3750 5500 3750 2000 4000 6500 1000 1000 1000 1500
E
F NOTES:
1- PASSING PLACES EACH 250 m.(FIG.1) 2- TURN ARROUND AREAS EACH 750m. (FIG.2) 3- "V" BUCKET MAY BE USED (SEE PHOTO)
2500
10000
F
G Rev. Date Prepared
Reviewed Status Stamp:
Approved
Reason / Description of changes. Project:
EAST ANGLIA Contractor: Status Stamp:
Location: Drg. Title:
BAWDSEY TO BRAMFORD
CONSTRUCTION SWATHE TYPICAL CROSS SECTION
H FIGURE 1 1 2 3 4 FIGURE 2 5 6 "V" BUCKET 7 8 Client:
Date of First Issue: Prepared
IMFE 15-07-2016
Reviewed GRAT
Approved FEDO
10 Drg. No.: EA1-GRD-E-IEC-007883 Contractors Drg. No. :
All rights reserved. Total or partial reproduction of this drawing without authorisation of the proprietor is prohibited. 9
11
Sheet: Next:
Scale:
1 - 0
Rev: 1:100 Size: 12 A2 H
G
ROAD
20000
ROAD
1750 1750
10000
1750 1750
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34