East Anglia ONE Offshore Windfarm Construction Artificial Lighting Emissions Plan


September, 2016


23.—(1) Construction work for the connection works and any construction-related traffic movements to or from the site of the connection works shall not take place other than between 0700 hours and 1900 hours Monday to Saturday, with no activity on Sundays or bank holidays, save— (a) where continuous periods of operation are required as assessed in the environmental statement, such as concrete pouring and directional drilling (subject to sub-paragraphs (3) and (4)); (b) for internal fitting out works associated with the onshore converter station comprised withinWork No. 39; (c) for the delivery of abnormal loads to the connection works, which may cause congestion on the local road network; and (d) where connection works are being carried out on the foreshore. (2) All construction operations which are to be undertaken outside the hours specified in sub-paragraph (1) must be agreed with the relevant planning authority in writing in advance, and must be carried out within the agreed times. (3) Construction of Work No. 21 shall not take place other than between 0700 hours and 1900 hours Monday to Saturday, with no activity on Sunday or bank holidays. (4) Construction of Work No. 26 shall not take place other than between 0700 hours and 1900 hours Monday to Friday and 0700 hours and 1400 hours on Saturday, with no activity on Sunday or bank holidays.


62.


There will be the need for lighting at certain HDD sites for 24 hour working. This will be concentrated on the working area with minimal light spill and disturbance outside of the working area. Approval will be sought prior to commencing any 24 hour works and residential receptors notified of the proposals. As per DCO approval will not be sought for 24 hour working atWork No. 21 orWork No. 26.


63.


There may also be a requirement for artificial lighting on emergency works, which in any case will need to comply with the minimum requirements for safe work operations, the guidance and standards (Section 2) and mitigation measures avoiding or minimising the impacts on sensitive visual and ecological receptors.


64.


At Primary CCS sites security will be 24 hour with lighting for the duration of the onshore construction works. At Secondary CCS sites security will be 24hr with limited lighting specific to compound offices and parking area and will required when the compound is in operation.


Page 16


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34