limited potential for location of access ramp, it is considered that the cumulative impact under this option would bemoderate adverse.
114. If the long HDD option is used for the first project, there will be no requirement for any of the projects to access the beach from the cliff, and therefore there will be no impact.
19.7.1.1.2Onshore cable route and converter station 115. No statutory or non-statutory sites are crossed by the onshore cable route or converter station. The impacts under Scenario 2 are considered negligible (see section 19.6.1.1.) which would be equivalent to the first project being constructed. Subsequent projects would also have impacts of negligible significance although the magnitude of those impacts would be lower. Overall the cumulative impact is considered to be negligible. Due to the absence of any designated sites within the onshore cable route and converter station there is no pathway for cumulative impacts with any other development.
19.7.1.2 Cumulative Impact 2: Impacts on soils 116. No soils of significant environmental value were identified at the landfall, onshore cable route and converter station (see section 19.6.1.2). Under Scenario 2, the impacts of open trenching and installing ducts are considered to be minor adverse. Subsequent cable installation operations for future projects would also have minor adverse impacts, although of a lower magnitude. Overall it is considered that cumulative impacts would be minor adverse.
19.7.1.3 Cumulative Impact 3: Impact on Ground Condition and Human Health 117. The first project to be constructed will undertake the majority of the excavations required for future projects. It is intended that where the onshore cable route crosses potentially contaminated sites such as historic landfills any jointing pits required for future projects would be located away from any such sensitive area. Therefore any impact would largely be caused by the first project and would only relate to the period of the first project’s construction. In section 19.6.1.3 the impact of the first project is considered to be minor adverse, given that subsequent projects would not need to undertake major excavations and jointing pits would be located sensitively as described above, their impacts would be negligible. The overall cumulative impact therefore is not considered to be above minor adverse.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 19 Soils, Geology and Ground Condition Page 47
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58