Table 19.19 Summary of projects considered for the CIA in relation to Soils, Geology and Ground Condition Project
Status
Construction / operation period
5Distance from Direct Impacts Study Area (km)
East Anglia ONE Application 2018 –2019 0 Project definition
Project data status
Included in CIA
Rationale
Offshore Windfarm Project
Project description available
East Anglia FOUR Pre-Application 2021 –2022 0
Offshore Windfarm Project
Outline project data only
Sizewell C Pre-Application Unknown 24.7
Nuclear Power Station
No project detail available
Bramford- Twinstead
SITA (EfW plant) Pre-Application Unknown In construction
Present – late 2014
0 0.5 Outline only
Energy From Waste Plant
Project description available
5 Shortest distance between the considered project and East Anglia THREE– unless specified otherwise. Preliminary Environmental Information May 2014
Complete/high No Complete/high No Low No Incomplete/low Yes
Complete/high
Yes
Construction would not overlap. Operational & decommissioning impacts only
Construction would not overlap. Operational & decommissioning impacts only
No spatial overlap with onshore electrical transmission works, too distant to impact same receptors
May adjoin converter station location
Would be operational before construction commences. No spatial overlap with onshore
East Anglia THREE Offshore Windfarm
Chapter 19 Soils, Geology and Ground Condition Page 44
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58