5 REFERENCES
British Geological Survey, Geological mapping online.
www.bgs.ac.uk, accessed March 2012. British Standards Institution (2011), ‘BS 10175:2011. Investigation of potentially contaminated sites: Code of practice’.
Department of the Environment (2011). Draft Planning Policy Statement 23: Enabling Development (currently under public consultation). (
www.planningni.gov.uk)
Environment Agency (2004), Model Procedures for the Management of Contaminated Land. Contaminated Land Report Number 11 (CLR11), September (Bristol: Environment Agency). Environment Agency (2010), ‘GPLC1 – Guiding Principles of Land Contamination’,
Frequency Asked Questions, Technical ‘GPLC3 – Reporting Checklists’, all March.
‘GPLC2 – Information, Detailed Advice and References’, and
Office of the Deputy Prime Minister (2004), Planning Policy Statement 23: Planning and Pollution Control (London: The Stationery Office).
Rudland, D. J., Lancefield, R. M. and Mayell, P. N. (2001), CIRIA C552. Contaminated Land Risk Assessment: A Guide to Good Practice (London: CIRIA).
East Anglia Offshore Wind Limited
Preliminary Risk Assessment, East Anglia ONE Windfarm 41388-PRA(03)
30
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65