Table 6: Risk estimation for potentially complete pollutant linkages Potential source


Organic and inorganic contamination within soil and groundwater, associated with:


▪ possible fill materials in former pits;


▪ mineral extraction; ▪ works/depots sites; ▪ railways, tramways; ▪ military bases; and ▪ electricity substations


Potential receptor Adjacent site users


Possible pathway Direct contact


Migration in groundwater followed by direct contact


Vegetation Perched groundwater


Aquifers (including Zone 1 and Zone 2 SPZs and NVZ)


Surface watercourses Buildings and infrastructure SSSI, SPA and Ramsar site


Unexploded ordnance associated with the military base and the decoy pond


Potential contaminated groundwater and leachate from landfill sites


Adjacent site users Buildings and infrastructure Adjacent site users Vegetation Perched groundwater


Aquifers (including Zone 1 and Zone 2 SPZs and NVZ)


Surface watercourses Buildings and infrastructure SSSI, SPA and Ramsar site


Hazardous ground gases associated with landfill sites and gases associated with sewage works


Inorganic and organic contamination associated with sewage works;


Organic contamination associated with slurry lagoons


Adjacent site users Buildings and infrastructure Adjacent site users Vegetation Perched groundwater


Aquifers (including Zone 1 and Zone 2 SPZs and NVZ)


Surface watercourses East Anglia Offshore Wind Limited


Preliminary Risk Assessment, East Anglia ONE Windfarm 41388-PRA(03)


Root uptake Vertical and lateral migration Vertical and lateral migration Vertical and lateral migration Chemical attack


Vertical and lateral migration in groundwater


Direct contact Direct contact


Migration in groundwater followed by direct contact


Root uptake Vertical and lateral migration Vertical and lateral migration Vertical and lateral migration Chemical attack


Vertical and lateral migration in groundwater


Direct contact Direct contact


Migration in groundwater followed by direct contact


Root uptake Vertical and lateral migration Vertical and lateral migration Vertical and lateral migration Likelihood Likely: neighbours close to route in some locations Low likelihood: possible but not certain that pathway may exist


Likely: vegetation along the route could be affected by soil/groundwater contamination


Likely: presence of shallow perched water extremely likely and any migration of impact will affect this


Likely: construction in areas of contamination could result in migration to aquifers


Likely: due to extent of construction work, it is possible impact will pass into a surface watercourse


Low likelihood: possible but unlikely due to routing of cable away from buildings as far as possible


Likely: route passes through these areas, so mobilisation of contamination will affect them


Low likelihood: presence of unexploded ordnance not considered likely, but possible


Low likelihood: presence of unexploded ordnance not considered likely, but possible


Low likelihood: possible but not certain that pathway may exist


Likely: vegetation along the route could be affected by groundwater contamination


Likely: presence of shallow perched water extremely likely and any migration of impact/leachate will affect this


Likely: construction in areas of contamination could result in migration to aquifers


Likely: due to extent of construction work, it is possible impact from groundwater or leachate will pass into a surface watercourse


Low likelihood: possible but unlikely due to routing of cable away from buildings as far as possible


Likely: route passes through these areas, so mobilisation of contamination will affect them


Low likelihood: unlikely that conditions will occur where gases build up to sufficient levels to be hazardous to human health or able to cause an explosion


Low likelihood: unlikely that conditions will occur where gases build up to sufficient levels to cause an explosion


Unlikely: possible but not certain that pathway may exist


Low likelihood: vegetation along the route could be affected by soil/groundwater contamination


Low likelihood: presence of shallow perched water extremely likely and any migration of impact will affect this


Low likelihood: construction in areas of contamination could result in migration to aquifers


Low likelihood: due to extent of construction work, it is possible impact will pass into a surface watercourse


Severity Medium: potential for damage to human health Medium: potential for damage to human health Risk and justification


Moderate: direct contact with neighbours is possible if contamination is mobilised by this construction project


Moderate/Low: small possibility of contact if contaminated water is mobilised by construction work


Minor: damage to vegetation is not likely to be significant Low: impact to vegetation not likely to be significant


Medium: potential for pollution of sensitive water resources


Medium: potential for pollution of sensitive water resources


Medium: potential for pollution of sensitive water resources


Minor: potential for damage to buildings or structures Medium: potential for damage to sensitive ecosystems


Severe: if encountered, potential for explosions to result in death


Mild: explosion could result in severe damage to buildings or structures


Medium: potential for damage to human health Moderate: potential for impact to sensitive water body Moderate: potential for impact to sensitive water body Moderate: potential for impact to sensitive water body


Very low: low sensitivity of receptor means this is not a significant linkage


Moderate: deleterious impact on sensitive areas is possible if existing contamination is present


Moderate: although unlikely, potential effect is severe, so linkage remains moderately significant


Low: risk is considered low as buildings/structures are repairable should linkage occur


Moderate/Low: small possibility of contact if contaminated water is mobilised by construction work


Minor: damage to vegetation is not likely to be significant Low: impact to vegetation not likely to be significant


Medium: potential for pollution of sensitive water resources


Medium: potential for pollution of sensitive water resources


Medium: potential for pollution of sensitive water resources


Minor: potential for damage to buildings or structures Medium: potential for damage to sensitive ecosystems


Severe: if gases do build up, result could be asphyxiation or explosion resulting in death


Moderate: potential for impact to sensitive water body Moderate: potential for impact to sensitive water body Moderate: potential for impact to sensitive water body


Very low: low sensitivity of receptor means this is not a significant linkage


Moderate: deleterious impact on sensitive areas is possible if existing contamination is present


Moderate: potentially severe outcomes mean that linkage has moderate risk despite low likelihood


Mild: potential for significant harm to buildings/structures Low: low sensitivity of receptor means that linkage has low risk


Medium: potential for damage to human health


Low: small possibility of contact if contaminated water is mobilised by construction work


Minor: damage to vegetation is not likely to be significant Very low: impact to vegetation not likely to be significant


Medium: potential for pollution of sensitive water resources


Medium: potential for pollution of sensitive water resources


Medium: potential for pollution of sensitive water resources


Moderate/Low: potential for impact to sensitive water body


Moderate/Low: potential for impact to sensitive water body


Moderate/Low: potential for impact to sensitive water body


25


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65