3 PRELIMINARY RISK ASSESSMENT (PRA)


3.1 Review of aerial photographs Aerial photographs are available for this project, and as part of the PRA these have been analysed to identify any potential


contamination. Comments from this analysis are provided below. 3.1.1 Landfall


Beyond the beach and cliffs present along the coast, the landfall site mainly comprises agricultural


land. However, associated with former RAF use of the land east of Middle Barn for a radar station. 3.1.2 Preferred Onshore Cable Corridor


The Preferred Onshore Cable Corridor primarily crosses agricultural land, with several golf courses. There was some evidence of


flooding on land close to where Queen’s


Fleet meets the River Deben (approximate grid reference 6335 2390). Areas of rough or disturbed ground were noted at the following locations:


• An area of rough looking land (grid reference 6277 2437) close to the track leading from a nearby works, located 100m to the west of the Preferred Onshore Cable Corridor corridor.


• An area of possible disturbed ground to the west of the A12 (grid reference 6253 2481).


• A small area of possible disturbed land between Tuddenham Hall and Larks Hill (grid reference 6194 2491).


• Possible area of mineral extraction (grid reference 6122 2490) close to a lake in an area where mineral works are present outside the Preferred Onshore Cable Corridor to the west (approximately 100m).


There is also a site that appears to be some kind of works or depot within the proposed corridor south of Little Blakenham, at grid reference 6113 2480.


3.1.3 Converter Station Refined Area of Search The aerial photographs of


there is also evidence of buildings and hardstanding issues relating to ground conditions or


the Converter Station Refined Area of Search show


agricultural land. There is an electricity substation bordering much of Converter Station Refined Area of Search.


East Anglia Offshore Wind Limited


Preliminary Risk Assessment, East Anglia ONE Windfarm 41388-PRA(03)


5


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65