Consultee
Greater Gabbard OffshoreWind Limited (GGOWL)
Date /Document
5.03.2013 / Relevant representations
Comment
Greater Gabbard has been in operation since September 2011…The East Anglia ONE cable corridor crosses the existing Greater Gabbard export cables. It is also possible that construction and operational transit routes may cross or overlap GGOWL's existing operational routes.
In principal GGOWL is supportive of the East Anglia ONE application… Notwithstanding this, particular areas where GGOWL consider we may wish to make representations on this specific scheme are in relation to construction works, with particular reference to cable crossings and vessel movements.
The Royal Netherlands Yachting Union
5.03.2013 / Relevant representations
The Royal Netherlands Yachting Union, as representative of our Dutch yacht racing and cruising members, has interest in the safe navigation in and around Offshore Renewable Energy Installations. Because our members often have ports at the East Anglian coast as destination, we consider ourselves as stakeholder for the development of the East Anglia Offshore Windfarm, and would like to be registered as such.
18.2.1 Cable crossing agreements 7.
Response / where addressed in this PEI
The East Anglia THREE export cable will also cross the Greater Gabbard cables. Therefore EATL are engaging with Greater Gabbard to reach a cable crossing agreement (see section 18.3.1 below).
This will also be relevant to East Anglia THREE and any comments that Royal Netherlands Yachting Union have on this PEIR consultation will be taken into account.
The construction of East Anglia THREE would involve the installation of cables in proximity to existing active submarine telecommunications and electricity transmission cables which will require cable crossing / proximity agreements. As part of the Development Consent Order (DCO) application to the Planning Inspectorate, and in line with the NPS requirements, EATL will consult with the relevant cable operators which may be affected by the project and develop agreements where necessary. Specific and detailed consultation has been undertaken with the relevant cable operators, as detailed in Table 18.2.
8.
The end result of this process is that cable crossing or proximity agreements will be established prior to construction of the proposed East Anglia THREE project. These
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 18 Infrastructure and other users Page 4
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44