18.5.2 European Offshore Windfarm Developments near to East Anglia THREE 38.
Within the North Sea, Belgium, Denmark, Germany, the Netherlands and Norway are also developing offshore wind capacity within their territorial waters. Table 18.12 presents information on the offshore windfarms that are currently operational or in planning in European waters in the vicinity of the proposed East Anglia THREE project.
39.
The closest operational development to the proposed East Anglia THREE project is the Princess Amalia windfarm which is approximately 81km from the proposed East Anglia THREE project. The Brown Ridge Oost windfarm for which consent has been authorised is the closest planned windfarm and is located approximately 26km to the east of the proposed East Anglia THREE project (Figure 18.1). Brown Ridge Oost is within the Ljmuiden Development Zone which represents an area in which further windfarm development may be proposed. The boundary of the Ljmuiden Development Zone is located approximately 16km from the proposed East Anglia THREE project.
Table 18.12 Summary of Planned and Operational Offshore Windfarms outside of UK Waters near the proposed East Anglia THREE project. Site
Status Developer
Distance from the East Anglia THREE site(to nearest km)
Brown Ridge Oost Tromp Binnen Breeveertien II
Den HelderI Helmveld West Rijn
Beaufort
Eneco Luchterduinen 2018 Tender THV Mermaid
North Wester II Belwind Phase II
Belwind I (Bligh Bank) Egmond an Zee (OWEZ)
Seastar Northwind NV
Consent Authorised Consent Authorised Consent Authorised
Consent Authorised
Consent application submitted
Consent Authorised Consent Authorised Consent Authorised
Concept/Early Planning Concept/Early Planning
Concept/Early Planning Consent Authorised Operational Operational
Consent Authorised Under Construction
Eneco RWE
DONG Energy DONG Energy
Envelop (Eneco) DONG Energy
Nuon (Vattenfall AB) Eneco
Ministerie van Economische Zaken
THV Mermaid Colruyt
Belwind NV Belwind
NordzeeWind Seastar NV
Northwind NV (formally Eldepasco)
26 28 40
41 68 60
75 85
85 85
90 88 89 90
94 96
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 18 Infrastructure and other users Page 20
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44