Site
Status
Developer
Distance from the East Anglia THREE site(to nearest km)
Rental Thornton Bank I Thornton Bank Phase II 40.
Consent Authorised Operational Operational
Rental NV C-Power C-Power
99
103 104
Table 18.12 and Figure 18.1 only display windfarm projects where there is certainty over the intention to submit an application for development. Development areas, “concept / early planning”, “dormant” projects and cancelled projects are not displayed as it is not possible to assess the impacts of these.
18.5.3 Oil and gas pipelines and platforms 41. Historically, there have been three oil and gas platforms situated in the northern part of the East Anglia Zone one of which has recently been decommissioned and removed. These three platforms along with their proximity to the proposed East Anglia THREE project are presented in Table 18.13.
Table 18.13 Oil or Gas Platforms near the proposed East Anglia THREE project Platform
Description Site
Horne & Wren - Unmanned Tullow platform
Welland Field - ExxonMobil platform
Davy Field - Unmanned Perenco platform
42. Active
Decommissioned and removed in February 2011
Ceased production but not decommissioned
20 26 27
Distance from East Anglia THREE (to nearest km)
Offshore cable corridor
19 26 30
In the north of the East Anglia Zone, there are 96 oil and gas wells, the majority of which are plugged and abandoned. Two of the plugged and abandoned oil and gas wells are located within the East Anglia THREE site, with a third located in close proximity to the eastern edge of the site. A fourth is situated within the offshore cable corridor (Figure 18.2). All of these wells were exploratory wells which were found to be dry however licences have recently awarded for future exploration of the area (see section 18.5.4).
43.
Any significant additional infrastructure including operational platforms, wells and pipelines, are located just outside the northern boundary of the East Anglia Zone.
Preliminary Environmental Information May 2014
East Anglia THREE Offshore Windfarm
Chapter 18 Infrastructure and other users Page 21
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44