Impact


Impact 5: Disruption to oil and gas activity


Impact 6: Disruption to Ministry of Defence Activities


Impact 7: Disruption of unexploded ordnance


Operation


Impact 1: Effects on other UK windfarms


East Anglia THREE site boundary Four offshore export cables


Impact 2: Impacts upon burial of existing cables and pipelines


Impact 3 Interference and damage to sub-sea cables and pipelines


Impact 4: Disruption to aggregate extraction activity


Up to four offshore export cables.


Maximum possible number of cable crossings


Maintenance vessels transiting to and from site.


Wind turbines will be located within the site boundary at, as yet, undefined, locations, therefore the worst case scenario uses the entire area of the site which is 305km².


The maximumnumber offshore export cables for proposed East Anglia THREE project (therefore creating the maximum number of potential cable crossings) is four.


The maximum number of offshore export cables (and therefore creating the maximum number of potential cable crossings) for the proposed East Anglia THREE project is four.


The worst case scenario is that existing cables will be damaged by the installation of the proposed East Anglia THREE export cables


The majority of maintenance activity will be within the East Anglia THREE site and will be routed away from any dredging activity.


Key design parameters forming the realistic worst case scenario


As above (construction impact 1) As above (construction impact 1) Footprint of infrastructure


Rationale As above (construction impact 1) As above (construction impact 1)


The greater the footprint of the proposed East Anglia THREE project the greater the chance of disturbing UXO. The pre-construction surveys however will greatly reduce the chances of any disturbance by allowing the careful micro-routing of the cable to avoid UXO and other localised hazards


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 18 Infrastructure and other users Page 8


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44