search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
UNDERFLOOR HEATING


Joe Macdonald, from tiling contractors Ceramtek Ltd, said the spa project was one of the most complex he has been involved with due to the egg-shape of the changing area, deliberate randomised wall and floor tile sizes, complex falls and the changes in backgrounds.


Joe said: “We relied heavily on using a variety of BAL’s adhesive products to suit the changing conditions as the job progressed.


“We also had to take into account falls into central gullies and drains and incorporate the thermal dynamics of the project which required the use of specialist flexible adhesives and levelling compounds.


“Thankfully, we have a good working relationship with BAL from previous large-scale projects so brought them into the equation to assist. BAL produced an excellent specification of fixing solutions, on-site project support and outstanding technical advice on this project which everyone knows is the most trusted in the industry.”


www.bal-adhesives.com


twitter.com/TomorrowsTS


— 27 —


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40