ADF06_26-38 6/27/08 9:34 AM Page 37
Chief Executive of the LDA,
Rubb Buildings
Manny Lewis said: “The new 50m
pool will put Hillingdon on the map
The new state of the
in terms of first class sporting
art Meadowbank
facilities, providing an excellent
Sports Arena, at
recreation venue for local residents
70m x 145m and with
sidewalls of 9m is
as well as bringing wider
currently the largest
regeneration benefits to the
of its kind in Europe.
community.
The arena's indoor
The LDA is proud to support the
synthetic surface
development with both residents measures 137m x
and Olympic hopefuls alike 70m and can be
benefiting from the scheme.”
quickly divided by
Sean Holt London Regional
use of rebound boards which are removable at court positions.
Director, Sport England said:
Rubb’s sophisticated electrical netting system allows the court to be
"The Hillingdon multi sport
expanded so that the full hall can be used.
...more on this item at
www.adfonline.eu
complex will offer a range of
230
different sports under one roof
including, a fitness centre, sports
hall and swimming pool.
Lorient Polyproducts
This means that mums can go
Acoustic, smoke and fire seals from
swimming while at the same time
Lorient are helping to the £115m
their children can play football. redevelopment of 55 Baker Street in central
By making sport convenient and London. Fire doors play a vital role in
giving people choice they are more
preventing the passage of cold smoke,
likely to enjoy it and get the
as well as fire and hot smoke throughout
sporting habit.”
buildings, reducing the risk to occupants
The new sports and leisure
in other compartments of the building.
A combination of Lorient's IS8010 si
complex is due to be completed
automatic threshold seal, IS1212 Curved
in 2009, will also have the
Fin Batwing
®
acoustic and smoke perimeter
following features: sports hall,
seal and a LP1504 fire seal provided the
k below ground other than drainage is
fitness suite (including spin studio,
perfect integrated solution for the project.
The concrete foundations are in place and
dance studio, a small health suite ...more on this item at
www.adfonline.eu
ame of the building will start to get erected
and a series of treatment rooms) Tel: 01626 834252
. Once the steel frame is completed the
café, crèche.
231
www.lorientuk.com
/ blockwork will be able to commence 229
232
www.adfonline.eu
See inside back cover for Reader Enquiry Card or go online:
www.adfonline.eu
37
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44