Olympic Stadium facts and figures
• Over 1,000 construction workers will be
based on the Stadium site.
• 33 buildings on the Olympic Stadium
site have been demolished.
• Over 800,000 tonnes of soil has been
taken away to help create the
construction platform for the Stadium -
enough to fill the Royal Albert Hall nine
times over.
• The Stadium is highly sustainable,
containing around 10,000 tonnes of steel
the lightest Olympic Stadium to date.
• The total Stadium island site covers an
area of 40 acres – five times the size of
the Houses of Parliament.
• The Stadium is 53m high - taller than
Nelson’s Column (50m).
• The Stadium roof covers an area of
24,500 sq metres - the equivalent to
three and a half football pitches.
and economic change in East London.”
ODA Chairman John Armitt said: ‘Over the
next year the Olympic Stadium structure will
begin to emerge from the ground.
“People will be able to see with their own
eyes a stadium which is designed to be
different, an innovative and sustainable design
which uses temporary elements to meet a
complex brief, a stadium built for both Games
and legacy.
‘It is great news that we can make an early
start but this is a project with an immovable
deadline so we know there are big
challenges ahead.”
Chairman of the London Organising
Committee, Sebastian Coe, said: “The Olympic
Stadium will be the jewel in the crown of the
Olympic Park. It will be a fantastic centrepiece
Continued on Page 24
See inside back cover for Reader Enquiry Card or go online:
www.adfonline.eu
23
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44