This page contains a Flash digital edition of a book.
Bowls Renovation Pitchcare Classifieds


Winter woes for synthetics


have settled on the playing surface. Such contamination will become trapped beneath quick- falling snow, unable to be removed and so left to decompose into the carpet. As long as the pitch is being adequately maintained throughout the rest of the year, this should not pose too severe a problem, but in all cases it is important to remove any trapped debris by dragbrushing and power sweeping the surface as soon as possible. Lastly, when the snow does begin to thaw, you


will need to ensure that your pitch’s drainage system is able to cope with the rapid dispersal of such a large volume of water. This is an important requirement throughout the life of an artificial pitch, but the need for adequate drainage is most apparent during the autumn and winter months, with both an increase in rainfall and the potential for heavy snowfall. A sand-filled pitch with poor drainage


One of the most common questions asked during winter is “how can I defrost my surface?”, and there is still the mistaken belief that artificial pitches are somehow immune from the elements


Erroneously labelled as “all-weather”, the very construction of artificial pitches puts them at risk when confronted with wintry conditions such as frost and snow. During the winter months, synthetic turf retains


a large moisture content, which will inevitably freeze, causing the playing surface to become hard and often unsafe to play on. It is not uncommon for an artificial pitch to remain frozen even when surrounding natural grass areas have thawed, due to the low core temperature of synthetic turf and the insulating effect that the infill and carpet creates. Freezing weather conditions can also put an artificial pitch at risk of seam and inlaid line failure: during periods of extreme cold, the contraction and expansion of the water as it thaws and refreezes will ‘blow’ the carpet seams and lines in much the same way as bursting pipes. An artificial pitch exposed to freezing temperatures may suffer the effects of weak or split seams, and such areas pose a trip hazard and must be repaired at the earliest opportunity. An effective solution to the problem of frost is the application of Pure Dried Vacuum (PDV) salt. PDV salt contains few impurities, so is less likely to cause damage or contamination to synthetic turf. Other products, such as rock salt or grit, should definitely be avoided as, once dissolved, they could cause contamination and damage to the playing surface. Chemical-based solutions do work, although they can be costly and offer little in the way of residue life. PDV salt should be considered a preventative


anti-freeze application rather than used as a de- icer, and one application will not necessarily provide a long-term remedy. Furthermore, the benefits of using PDV salt will vary according to the prevailing weather conditions, and results differ from site to site, so cannot be guaranteed. If left untreated, a pitch that has frozen can be


compounded with snow, which will quickly settle on an artificial pitch and remain for a longer period as it sits on the frozen carpet. As with frost, snow often melts quicker on surrounding natural


150 I PC OCTOBER/NOVEMBER 2016


grass and hard-standing areas before it melts on synthetic turf, due to the insulated low core temperature of the surface. The safest solution for a facility affected by a


heavy snowfall is to simply close the pitch until it thaws and becomes safe to use. The alternative - to attempt the removal of snow from an artificial pitch - poses several difficulties: having suitable space to stock large piles of snow; the potential to damage the turf when using snowploughs - particularly if a layer of ice lies between the snow and the carpet; and displacement of the granular infill along with the snow, leaving the synthetic turf fibres unsupported and at risk of increased wear. If you do consider clearing snow, it is vital that this is done when the snow first falls; if it is allowed to thaw and re-freeze, it will be almost impossible to remove snow or ice without also causing damage to the carpet. So, whilst snow presents its own unique


problems, with little that can be done in terms of preventative measures, identifying and then reacting swiftly to the effects of a heavy snowfall can help get your artificial pitch up and running at the earliest opportunity. The sheer weight of a large amount of snow will


inevitably flatten the synthetic turf fibres and compact the infill. This can be remedied with a decompaction once the snow has cleared. A specialist decompaction will both agitate the carpet pile and remove contamination, simultaneously lifting the carpet fibres and loosening the rubber particles that have become flattened and compacted by the weight of the snow. Keeping the pile upright not only protects the carpet fibres from wear, it also preserves the playing characteristics and restores the aesthetic qualities of synthetic turf. Loosening the granular infill, meanwhile, helps to improve drainage and control the feel of the playing surface underfoot, whilst allowing for infill levels to be regulated at repeated intervals. Secondly, in the weeks leading up to a snowfall, dirt, leaf debris and other detritus is also likely to


capabilities will display tell-tale signs such as tide marks or silt areas on the playing surface; this is caused by rainwater backing up and flushing out contamination (leaf and tree debris, dirt, broken- down carpet fibres) from the infill, depositing it onto the surface as it drains away. If unattended to, such material is likely to pose an ongoing health and safety issue for the users of the surface. Whilst the same problems with drainage occur on 3G pitches, their symptoms are less visible; the rubber infill retains excess water, similar to a natural turf surface, and a 3G pitch with poor drainage will instead feel soft and 'squelchy' underfoot. As a corrective measure, a restorative deep-


cleaning process will remove the contaminated infill, replacing it with fresh, clean aggregate. Our experience has shown that this method, followed by a suitable maintenance programme, will give at least five years extended life and, in some cases, much longer. However, the best preventative action to take to


avoid drainage issues is to implement a comprehensive maintenance regime on your artificial pitch, ideally from day one. Combining daily and weekly brushing in-house with a regular maintenance programme will help to provide a consistent playing surface all year round. Understanding how best to react to the effect


winter conditions will have on your pitch can help you to reverse its impact both quickly and effectively.


This article is from the Pitchcare archive and was originally part of a longer feature written by Emma Kealy of Technical Surfaces. www.technicalsurfaces.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164