showpiece ceiling in the main area and which extend to the exterior soffits. The design used Hunter Douglas Prestige FR MDF 16mm concealed grid panels, finished in birch veneer to complement the modern glass structure of the pavilion, and are decorated with a slot pattern (8mm x 88mm ctc 48mm).
suspended ceiling panels, which create a
01604 766251
www.hunterdouglas.co.uk enq.156
Heradesign works out for Leisure Centre
enhances the contemporary interior. Umesh Mistry of GT Architects specified Heradesign commenting: “Heradesign is strong and robust and can cope with substantial wear and tear to meet user and client demand. Heradesign’s Class A sound absorption helps control noise in this highly reverberant area enabling us to create a comfortable space where people can play sport without intrusive noise.”
0191 518 8600
www.amfceilings.co.uk/heradesign ASSA ABLOY sees BIM uptake
ASSA ABLOY Security Doors, a UK division of ASSA ABLOY, a global leader in door opening solutions is beginning to see the uptake of BIM. As one of the first doorset manufacturers to launch a BIM offering, ASSA ABLOY Security Doors has begun to receive requests for its BIM objects, following the deadlines passing for both the use of
BIM on all Government projects and the adoption of the Government Soft Landings process. ASSA ABLOY Security Doors’ BIM offering contains 72 door objects that can be used in standard applications such as corridors, toilets, offices and fire exits. The BIM objects will also aid maintenance activities in order to make whole life asset management possible.
enq.160 Architects Datafile website
The Architects Datafile (ADF) website is an online provider of past and present products and news items for the architect or specifier.
architectsdatafile.co.uk is a one-stop source for all the latest press releases providing any visitor with access to information about products and services that they may require. From the website, you can find links to digital issues that have live links to advertisers’ sites, as well as daily email alerts to keep you as informed as possible.
www.architectsdatafile.co.uk
• Suitable for homes without access to mains drainage • Discreet solution to on-site sewage treatment • 10 models in the range with a capacity up to 50pe • CE Marked and EN 12566-3 Certified • Uses the extended aeration method to treat sewage • 96% efficiency allows a typical 3-5 year emptying interval • Visually unobtrusive and odourless • 25 year warranty on GRP & 2 year warranty on the air pump • Deal direct with the Manufacturer
0800 731 9421
www.webuildit-ltd.co.uk enq.162
www.architectsdatafile.co.uk enq.158
Heradesign wall panels from Knauf AMF have played their part in ensuring the success of a project by providing the highest acoustic and durability specifications required for Oldham Leisure Centre’s eight-court sports hall. Heradesign’s unique textured surface helps make the hall visually appealing and
Hunter Douglas ceiling delivers for school A stunning new cricket pavilion at one of Britain’s top schools features a striking bespoke ceiling from leading architectural products manufacturer Hunter Douglas. Oundle School’s JM Mills Pavilion features 200m2
(2,152 ft2
) of Hunter Douglas
sports & leisure facilities project report; planning & design; groundworks; structural elements Hollo-Bolt gains more approvals
47
Lindapter’sHollo-Bolt recently gained the LARR (Los Angeles Research Report) and the full seismic approval from ICC-ES for use in all Seismic Design Categories (A to F). Following these approvals, the CE Marked
Hollo-Bolt was specified for Wilshire Grand Center in Los Angeles, the tallest skyscraper in Western U.S. Lindapter’s Hollo-Bolts allowed a quick installation of circular structural hollow sections, forming the atrium framework. Avoiding drilling and welding saved the contractor time and money and gave a neat finish which complemented the architecturally exposed steel design.
01274 521444
www.lindapter.com Rå Build meets the need for speed
H+H’s Rå Build method has been used by design and build contractor Canning Ericsson to speed construction of a three-storey apartment block on a confined site in Brighton. Canning Ericsson was already familiar with the advantages of H+H’s Rå Build method of large format aircrete blocks, the
Thin-Joint System and quick-drying Celfix Mortar having used the modern construction method on several of its previous schemes. Aircrete’s structural strength was important because the weight of the project’s cast in situ reinforced concrete first and second floor slabs is carried by the High Strength Thin-Joint Blocks that form the inner leaf of the building’s external cavity wall.
01732 880520
www.hhcelcon.co.uk enq.159 enq.157
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84