This page contains a Flash digital edition of a book.
To advertise in this section contact


Peter Britton on 01747 855335 email: peter@pitchcare.com


Bowls Classifieds SPRING SPORTS TURF CONTRACTORS D W Clark DRAINAGE LTD


SPECIALIST SPORTSTURF CONSTRUCTION & DRAINAGE CONTRACTORS • Gravel Banding • Sand Slitting


• Top Dressing • Renovation • Irrigation Unit 7, Brailes Industrial Estate, Winderton Lane, Lower Brailes Banbury, Oxfordshire OX15 5JW


Tel: 01608 685800 Fax: 01608 685801 email: jim@dwclarkdrainageltd.co.uk Web: www.dwclarkdrainageltd.co.uk SPORTSTURF


D CRANE EST. 1984


CONSTRUCTION Golf Courses and Sports Fields


Sand Slitting, Gravel Banding, Piped Drainage DRAINAGE Koro Top Dressing, Overseeding, Sand Spreading Verti Draining, Scarifying, Hollow Coring,


For further details & consultation contact 07860 458822 or 07921 290985


Tel: 01772 780545 danvicturfcare@btconnect.com


Mobile: 07768 122577


www.EARTHBOUND SERVICES.co.uk SPORTS PITCH SPECIALIST


An instant solution to poorly drained pitches this season. The Sandmaster can provide drainage solutions by injecting sand into the turf by continuous channels without any disruption to play.


ALSO •Koro Cutting •Laser Grading •Stone Removal •Excavations


FTS


Sportsground & Amenity Contractors


Cricket Pitch Specialists


Unit 5, Beenham Industrial Estate Reading, Berkshire RG7 5PP Tel: 0118 9714420 Mob: 07768 696291 Fax: 0118 9714522


www.fts-sportsturf.co.uk 114


• Sports Pitch Construction • Earthworks • Maintenance • Drainage & Irrigation • Custom Grown Turf


• Install n Playball Turf Tiles 01400 251605


www.fine-turf.co.uk info@fine-turf.co.uk


Fungicide, Pesticide, Herbicide


RENOVATION SPRAYING


SCONSTRUCTION DRAINAGE


Sand Slitting, Gravel Banding V RENOVATION


erti Draining, Hollow Coring, Scarifying, Koro Field Topmaker, Topdressing, Overseeding, Sand Spreading


MAINTENANCE


Spring Maintenance of Bowling Greens by David H Bates


weather, soil and air temperatures begin rising above 10O


T ports Fields and Golf Courses


encouraging and stimulating grass growth.


C, thus 01883 340969 email: earthbounds1@aol.com Kevin Baker


It is during March and early April that spring renovations are carried out to prepare the greens for the forthcoming playing season. The main objective for the greenkeepers is to provide a consistent playing surface. The first operation is to firm up the greens, particularly after a period of frosts, when the ground has been lifted. This is carried out by rolling the green using a mower in the disengaged mode (no cylinder blades working) walking slowly in several directions over the surface of your green. Subsequent rolling can be carried out using a 50kg weight roller. When rolling, think of a clock face; the first run starting at 12 o’clock and finishing at 6 o’clock. Then starting at 3 o’clock and finishing at 9 o’clock. Work around the clock when conditions allow, not when the soil is saturated or frosted. Ideally, perform this operation when the surface is drying out and the sub surface is moist. This will help firm the playing surface. A programme of surface aeration is beneficial, particularly to help drain away any surface water or address any surface compaction resulting from recent rolling activities. This can be achieved using a Sarrel Roller or a set of micro tines attached to a pedestrian mechanical spiker. Most of the deeper aeration


works should have been completed during the winter months, i.e. November to February. Try to avoid the use of slit tines during the spring and summer as these types of aerators can lead to surface disruption, affecting playability. If you need to aerate during the playing season use solid tines.


may need to apply a dressing of lawn sand. This will help check any moss growth that has accumulated during the winter months. This should be carried out prior to any scarification work being undertaken. The moss should either turn black in colour or be visibly dead prior to raking/scarification procedures. A programme of light


scarification works, using verticutting reels or dedicated scarifying machines set at a shallow depth, can be implemented in spring to remove any debris.


Once growth has picked up, you


he onset of the bowls playing season usually begins in March when favourable


Daily brushing and switching should continue to keep the greens clean and remove any early morning dew. Keeping the sward dry, particularly in the spring, helps minimise the likelihood of any disease attacks. Worm activity will increase as the soil temperatures begin to rise and the soils remain moist. It may be necessary to apply an approved product to control worm activity. Ideally, you should have carried out a soil analysis to establish the nutrient status and pH of your green. The results of this test will help you determine an effective fertiliser programme for the coming year.


Mowing


Mowing is one of the most important practices and should be carried out on a regular basis. Cutting frequencies will depend on the weather and ground conditions. During the playing season, March to October, the greens should be cut at least three times a week, if not daily. Machines should be at least 7 to 9 bladed cylinder mowers that are well maintained and sharp. Height


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124
Produced with Yudu - www.yudu.com