This page contains a Flash digital edition of a book.
RC1209_028-029_Feature 12/31/09 7:31 AM Page 28
FEATURE
New FAA Certification Process
Streamlines WAAS LPV Upgrade For
Universal Avionics FMS Operators
By: Dan Reida
Prompted by growing demand for its cation path for the WAAS/SBAS-FMS. WAAS Localizer Performance with Verti-
WAAS-capable Flight Management Sys- Referred to as the “Engineering Assisted cal (LPV) via FAA field approval (337).
tems, Universal Avionics collaborated with Field Approval Process,” it provides Uni- Using this method avoids a costly and la-
the FAA to develop a streamlined certifi- versal FMS operators an upgrade path to borious Supplemental Type Certificate
28 ROTORCRAFT PROFESSIONAL • Heli-Expo 2010 Preview Issue
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52
Produced with Yudu - www.yudu.com