RC1209_028-029_Feature 12/31/09 7:31 AM Page 28
FEATURE
New FAA Certification Process
Streamlines WAAS LPV Upgrade For
Universal Avionics FMS Operators
By: Dan Reida
Prompted by growing demand for its cation path for the WAAS/SBAS-FMS. WAAS Localizer Performance with Verti-
WAAS-capable Flight Management Sys- Referred to as the “Engineering Assisted cal (LPV) via FAA field approval (337).
tems, Universal Avionics collaborated with Field Approval Process,” it provides Uni- Using this method avoids a costly and la-
the FAA to develop a streamlined certifi- versal FMS operators an upgrade path to borious Supplemental Type Certificate
28 ROTORCRAFT PROFESSIONAL • Heli-Expo 2010 Preview Issue
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52