Table 4: Time and power proportions, only applicable for the steel version Time proportion 3 %


82 % 15 %


Gas turbine 100 % 95 % 20 %


5. LIFE CYCLE COST ANALYSIS


An LCC model of Woodward [3] has been chosen to analyse the costs of the three different ship concepts. This model is simple but covers all aspects of importance for the cost comparison at this stage. The adjusted flow chart in figure 3 presents the steps that lead to the LCC of the vessel. The energy assessment included in this chart will not be presented here in detail and interested readers are referred to [1].


Steel version Aluminium version Operation profile Cost


breakdown structure


Calculate costs at


current prices Escalate current costs


Discount costs to base periode


Sum-up costs and energy Energy


breakdown structure


Calculate energy


consumption Cost


breakdown structure


Calculate costs at


current prices Escalate current costs


Discount costs to base periode


Sum-up costs and energy Energy


breakdown structure


Calculate energy


consumption Cost


breakdown structure


Calculate costs at


current prices Escalate current costs


Discount costs to base periode


Sum-up costs and energy Energy


breakdown structure


Calculate energy


consumption


Table 5: Planning, design, and production cost breakdown Cost element


Planning, total


Conceptual design Basic design


Detailed design Design, total


Break-even analysis Sensitivity analysis


Figure 3. LCCA and energy assessment process,followed by a break-even and sensitivity analysis


Traditionally, the cost breakdown comprises all cost


elements of a product. Since the presented study is of a comparative nature, identical or similar costs are not considered.


The cost elements are grouped according to their appearance in the


different periods of life.


terminology of these three periods have been partly adopted from the model


adjusted according to the considered cost elements in shipbuilding and operation:


 Planning, design and production costs  Operation and maintenance costs  Disposal costs


B-4 of Woodward, and partly The Structure, waste Insulation


Machinery and electrical


Material, total Tooling


Fabrication, structure


Energy costs for manufacturing


Manufacturing, total


Planning, design, and production, total


32.60 6.39


Outfitting 12.60 0.50


49.15 45.90 0.14


0.45 9.00


12.74 0.62


19.63 22.81 75.33


(M€) 0.10


6.30


Outfitting 5.80 Interior


7.80


3.05 1.05 6.30 8.10


0.15 1.50 4.55


6.20


Engineering, total 0.25 0.35 Structure


2.35 0.60


0.15 1.55 4.60


Composite version


Diesel engine 100 % 90 % 20 %


For input data in labour hours the following rates are used; Production hours 45.00 €/h, Design/Engineering hours 50.00 €/h


6. PLANNING, DESIGN, AND PRODUCTION


In the planning costs, market analysis and feasibility studies are included. The design phase is split up into three elements, according to the terminology of Aker Finnyards. In the detailed design, workshop drawings, review, tests and documentation are included. In the engineering during the production phase, production control and support are included. Material – The data source for the steel and aluminium version are based on Aker Finnyards experience. For the composite version the weight and costs are calculated in the preliminary design study [2]. The outfitting and waste cost is based on Kockums experience. The insulation (fire) is: material 0.065 M€ and labour 700 h · 45 €/h. The cost for the machinery and electrical systems for the composite version is taken as the same as for the aluminium version. As mentioned earlier no investment costs in additional infrastructure due to technology adaptation of a manufacturer is considered in this study. The cost break down is presented in table 5.


Steel Aluminium Composite (M€) 0.10


(M€) 0.13


0.15 1.50 4.25


5.90 0.30


11.20 1.68 5.70 6.00 0.10


27.40 27.40 52.08


0.29


11.93 9.00 0.63


21.85 75.43 80.26


©2008: Royal Institution of Naval Architects


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68