Fig. 2. Design Parameters for ENSCO 120 Series Harsh Environment Jack-ups. Variable Deck Load (VDL): Normal operating:
Storm operating: Storm survival: Normal jacking: Emergency jacking:
ranging from 8,200 kips to 14,300 kips depending on water depth and environmental condition
9,100 kips in water depths from 328 ft to 400 ft 6,500 kips in water depths from 328 ft to 400 ft 8,100 kips 40,200 kips (nearly 100% of preload in addition to full normal jacking VDL)
Environmental resistance is a critical factor in the North Sea, but also essential in the continental shelf areas of the Gulf of Mexico, Indian Ocean, and Western Pacific Rim, where tropical storm systems create extreme weather threats. Te Keppel FELS Super A Class rig is hardened to withstand -20°C service temperatures in order to meet the requirements of operating in the northern areas of the UK sector. Not only must the hull and legs be constructed of appropriate low-temperature steel alloys to avoid embrittlement at low temperatures, but also the equipment, from derricks and cranes to drawworks and jacking systems, must meet the same specifications. However, in keeping with the requirements of a rig with true world-wide capability, Ensco specified the rig’s systems to handle anticipated extremes of temperatures from the Northern Central North Sea winter to the Arabian Gulf summer. Rough seas require rig design and construction techniques that can withstand the load from wind- whipped waves, whether the sea conditions are a fairly constant phenomenon, as in the North Sea, or less frequent but potentially worse, the hurricanes in the Gulf of Mexico and typhoons in the Asia/Pacific Rim area.
As water depth increases, rig stability becomes
more complex. With its 156-foot transverse leg centres and 150-foot longitudinal leg centres, the Super A is designed to operate in depths up to 400 feet. To achieve this 400-foot capability, the rig has been equipped with a total leg length of 540 feet.
Te inherent strength of this ultra-enhanced rig also makes it well-suited for hurricane survivability. Ensco’s assessment shows that the rig could withstand a 300-year storm at a specific location in the Gulf of Mexico, with 138-knot winds (Category 5 storm) and 91-foot waves.
Drilling capacity Drilling capacity has become a more critical design
40
www.engineerlive.com
issue with a number of new shallow-water projects targeting ultradeep gas reservoirs, notably in the US Gulf of Mexico and Australia. Reaching these fields at depths of more than 30,000 feet requires a more robust hoisting capacity and an efficient derrick. Te Keppel FELS Super A design, with a 2 million-pound hook load, is capable of drilling up to 35,000 feet. To expand the capability, Ensco specified a 2.5 million-pound hook load, which allows a drilling depth of up to 40,000 feet, and a derrick with automated quad racking capacity for efficient pipe-building. Multi-well programmes can be especially challenging for jack-ups in harsh environments, due to the need to sometimes reposition the rig to reach every well position in a development plan, in an environment that can mean long waits for suitable weather to jack down and perform said repositioning. Ensco enhanced the rig design with a patented cantilever system that expands the cantilever load allowing nearly the full 2.5 million pound live load to be handled at an 80-foot reach and 17-foot offset, allowing for larger developments without repositioning.
Outcome By analysing and specifying design requirements from the perspective of ‘area of operability,’ Ensco developed a rig that approaches ultra-harsh environment status at a more cost-effective level, with the flexibility to operate not only in a wider footprint within the North Sea, but in other environments that offer wind, weather and reservoir challenges. Te first two of the ENSCO 120 Series rigs are being delivered this year and are contracted to work in the North Sea. ●
For more information ✔ at
www.engineerlive.com/iog
John Knowlton is Senior Vice President – Technical with global offshore drilling contractor Ensco plc, London, UK.
www.enscoplc.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100