This page contains a Flash digital edition of a book.
Exploration • Drilling • Field Services


result of human errors during UPS load switching operations). Personnel safety and asset integrity significantly relies on ‘add-on’ measures including detailed procedures, insulated tools, personal protective equipment, etc.


However,


UPS technology advancements now enable a simpler way to capacity test a battery; Insulated Gate Bipolar Transistor (IGBT) chargers with regeneration (regen) allows energy from the UPS battery under test to be ‘regenerated’ instead of dumping the energy into a temporary load. A battery test is initiated, simply, using the UPS operator screen. Te required battery test current is automatically established by controlling energy fed back into the network as the platform load remains ‘on line’ whilst still being supported by the battery. After the required capacity has been drawn from the battery, the battery test data is recorded


and the UPS automatically reverts to normal operation. With regen, the requirement for specialist technicians to switch UPS loads or connect trailing cables onto live circuits during battery capacity testing is eliminated. ●


For more information ✔ at www.engineerlive.com/iog


Mark Burslem is with Dale Power Solutions Ltd, Scarborough, North Yorkshire, UK. www.dalepowersolutions.com


Fig. 3. Energy flow during on-line battery capacity test with Rege.


• Designs & manufactures automated welding machines & consumables for the oil & gas industry


• Manufactures over 300 different types of flux-cored & solid core welding wires


• Welding applications for joining / fabrication & hardfacing / cladding • Over 2,000 welding machines / equipment in service globally


Phone: +44 (0) 1763 207 500 Email: sales.uk@welding-alloys.com


Fax: +44 (0) 1763 207 501 Web: www.welding-alloys.com


For more information ✔ at www.engineerlive.com/iog


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100