This page contains a Flash digital edition of a book.
Building Maintenance, Refurbishment & Design


Yorkon publishes new technical paper


Off-site construction specialist, Yorkon, has published a new technical paper for construction clients and contractors, entitled ‘A Practical Guide to BREEAM – An Essential Tool for Sustainable Development, Design and Construction’.


BREEAM is the world’s foremost method of assessing and rating buildings for environmental efficiency, evaluating the specification, design, construction and uses of a building. Its measures include: energy and water use; pollution; transport; materials; waste and management processes. The new technical paper from Yorkon, part of the Portakabin Group, sets out the most recent changes to the BREEAM methodology and provides construction clients with a valuable guide to the process and how it should be thoroughly integrated into the design and construction phases of a project, as well as the important roles for the client, contractor, and architect.


The report looks at: • An introduction to BREEAM 2011 • The purpose of BREEAM • How and when a project is assessed • The benefits • The latest changes to the methodology and assessment • How off-site construction can add value to the BREEAM process.


uTo download a copy of the new guide to BREEAM, visit www.yorkon.info/industryreports


Solar windows shows its strengths on the Scilly Isles F


rom its manufacturing base in South Wales, REHAU commercial fabricator Solar Windows regularly supplies and installs windows to all four corners of the UK. It faced a new challenge recently however, when it was specified to install windows, doors and curtain walling in a new build BSF school 28 miles off the Cornish coast on St Mary’s in the Isles of Scilly. The £14m, 3,350m2 Five Islands School was a design and build project by Kier, funded mainly under the Building Schools for the Future programme and project managed by MACE. All 17,000 tonnes of material and components required for the build, which was the biggest construction project ever undertaken on the


islands, had to be transported from the mainland so the logistical skills of all the suppliers involved were tested to the limit. Solar Windows successfully rose to the challenge transporting 185 windows and 46 doors and completing the installation in a 9 month timescale.


The layout of the building around an open cloistered courtyard was deliberately designed to create an interconnection between the inside and outside areas of the school for the 230 pupils aged between 3 and 16, reflecting both the lifestyle on the Isles and the fact that the school is in an area of outstanding natural beauty.


For this reason, Solar was specified by Kier to manufacture and install glazed composite doors in REHAU outerframes in the majority of the classrooms opening onto the courtyard, as well as large 2950mm x 1625mm horizontal sliding windows to provide natural light and ventilation.


Elsewhere in the school, Solar installed windows in the REHAU S706 70mm system and a 15m x 3.8m section of glazed curtain walling in the REHAU Polytec 50S composite curtain walling system for the four court sports hall.


u01989 762600 uwww.rehau.com


14 www.education-today.co.uk


October 2012


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28