WINNING NUMBERS
x10,000
80,000 Specator capacity
during Olympics STADIUM x10,000
25,000 Specator capacity
designed for legacy 4,500
Tonnes of steel used for London Olympic Stadium
45,000 Tonnes of steel
used for Beijing Olympic Stadium
x1,000 532
Number of individual fl oodlights housed in 14 28m-high towers
Reduction in mains water usage as a result of rainwater recycling
70% 300,000
Nails used to build the Velodrome
7
The number of records broken by Team GB
28ºC
Temperature at track level to optimise performance
VELODROME 14 CIBSE Journal September 2012
www.cibsejournal.com 6,000 Spectator capacity 5.5km Mechanical pipework 4.2km Water pipework Ventilation ductwork 2km
It has been often mentioned that Team GB won 29 Olympic gold medals, but did you know there was 2km of ventilation ductwork in the Velodrome, or 10,000 toilets on the Olympic Park? Here are some of our favourite stats from the London 2012 Olympic Games
65
Medals won by Team GB
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80