Carbon Disclosure Project 2011 – Italy 100 Report
Q8.2a: Please provide your gross global Scope 1 emissions figures in metric tonnes CO2e
Q8.2b: Please provide your gross global Scope 1 emissions figures in metric tonnes CO2e – Part 1 Breakdown • Boundary • Gross Global Scope 1 emissions (metric tonnes CO2e)
• Comment
Q8.2c: Please provide your gross global Scope 1 emissions figures in metric tonnes CO2e – Part 1 Total • Gross Global Scope 1 emissions (metric tonnes CO2e) – Total Part 1
• Comment
Q8.2d: Please provide your gross global Scope 1 emissions figures in metric tonnes CO2e – Part 2 • Gross Global Scope 1 emissions (metric tonnes CO2e) – Other operationally controlled entities, activities or facilities
• Comment
Q8.3a: Please provide your gross global Scope 2 emissions figures in metric tonnes CO2e
Q8.3b: Please provide your gross global Scope 2 emissions figures in metric tonnes CO2e – Part 1 Breakdown • Boundary • Gross Global Scope 2 emissions (metric tonnes CO2e)
• Comment
Q8.3c: Please provide your gross global Scope 2 emissions figures in metric tonnes CO2e – Total Part 1 • Gross Global Scope 2 emissions (metric tonnes CO2e) – Total Part 1
• Comment
Q8.3d: Please provide your gross global Scope 2 emissions figures in metric tonnes CO2e – Part 2 • Gross Global Scope 2 emissions (metric tonnes CO2e) – Other operationally controlled entities, activities or facilities
• Comment 46
Q8.4: Are there any sources (e.g. facilities, specific GHGs, activities, geographies etc.) of Scope 1 and Scope 2 emissions which are not included in your disclosure? General reasons for exclusions can include the following: • Incomplete information for the period in question;
• Structural changes to the organization including: o Mergers, o Acquisitions, o Divestments;
• Outsourcing and/or insourcing of activities, and
• Unreliable information
Q8.4a: Please complete the table This question only appears if you answer “yes” to Question 8.4 • Reporting entity • Source • Scope • Explain why the source is excluded
Q8.5: Please estimate the level of uncertainty of the total gross global Scope 1 and 2 emissions figures that you have supplied and specify the sources of uncertainty in your data gathering, handling and calculations • Scope • Uncertainty range • Main sources of uncertainty • Please expand on the uncertainty in your data
Q8.6: Please indicate the verification/assurance status that applies to your Scope 1 emissions • No emissions data provided • Not verified or assured • Verification or assurance underway but not yet complete - first year it has taken place
• Verification or assurance underway but not yet complete - last year’s certificate available
• Verification or assurance complete
Q8.6a: Please indicate the propor- tion of your Scope 1 emissions that are verified/assured. • More than 0% but less than or equal to 20%
• More than 20% but less than or equal to 40%
• More than 40% but less than or equal to 60%
• More than 60% but less than or equal to 80%
• More than 80% but less than or equal to 90%
• More than 90% but less than or equal to 100%
Q8.6b: Please provide further details of the verification/ assurance undertaken, and attach the relevant statements • Type of verification or assurance • Relevant standard • Relevant statement attached
Q8.7: Please indicate the verification/assurance status that applies to your Scope 2 emissions • No emissions data provided • Not verified or assured • Verification or assurance underway but not yet complete - first year it has taken place
• Verification or assurance underway but not yet complete - last year’s certificate available
• Verification or assurance complete
Q8.7a: Please indicate the proportion of your Scope 2 emissions that are verified/assured • More than 0% but less than or equal to 20%
• More than 20% but less than or equal to 40%
• More than 40% but less than or equal to 60%
• More than 60% but less than or equal to 80%
• More than 80% but less than or equal to 90%
• More than 90% but less than or equal to 100%
Q8.7b: Please provide further details of the verification/ assurance undertaken, and attach the relevant statements
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52