could be undertaken at the site. These focused mainly on further improvements to the lighting and building-management systems, but also included suggestions for enhancing existing measure to engage staff with the drive for improving efficiency and cutting waste. Estimated energy and cost savings, together with ‘payback’ periods, are also provided with the recommendations – see Figure 2. Taken together, the measures above


would produce estimated annual electricity and gas savings respectively of 1.1m kWh and 973,200 kWh, with a total annual cost saving of £128,100. The cut in carbon emissions would total 770 CO2 tonnes per year. Payback periods for the £118,240 total cost of these measures range from a few months to three and a half years. Overall, this range of measures would be expected to raise the Energy Performance Certificate rating for the Shell Centre from D to C.


Lighting The recommendations for further action focus mainly on improvements to lighting efficiency, as follows.


www.cibsejournal.com


Wing offices: The current T8 lighting


fittings have a rated output of 36W and a calculated lighting level of 12.6 W/sq m. If this type of lighting is replaced with T5 fluorescent tubes rated at 28W, this will result in an improvement lighting level of 9.5 W/sq m. The calculated savings are 200,000


kWh and £18,000 per year. The associated saving in carbon dioxide emissions is 107 tonnes per year. Controls: The Shell Centre tower is


Benchmarking Comparison of site’s 2009 energy data Metering data are uploaded


Electricity consumption is recorded by two half-hourly electricity meters. In addition there are 17 non-half hourly sub-meters dedicated to metering the energy consumption of the boilers, chillers, the tower and the wings consumption. Gas consumption is recorded by three non-half hourly meters, one for the boilers, one for the main kitchen and one for the tower kitchen.


to the supplier’s web portal and can be interrogated remotely by the Shell Centre staff with appropriate user name and password. During Shell Centre Tower


renovation, local meters were installed on each floor to monitor the lighting, the small power and the UPS consumption individually. Energy costs for Shell Centre in 2009 were £1,896,000,


Additional changes recommended by an energy review included further improvements to lighting systems


comprising £1,332,000 for electricity and £564,000 for natural gas. Energy supplies were 14,800,000 kWh of electricity and 18,800,000 kWh of gas. The assessment of


performance indicates that the building’s emissions figure of 106 kgCO2/sq m is 47% worse (higher) than the Good Practice benchmark (72 kgCO2/sq m) and 20% better (lower) than the typical benchmark.


May 2011 CIBSE Journal 35


© David Osborne / Alamy


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84