ENERGY EFFICIENCY BUILDING CASE STUDY


Swimming pool – new trend control Swimming pool – chemical cover


Staircase lighting control – SC 1, 2, 3, 4, 5, 6 Plant room lighting control


Meeting room lighting control - YB121A,B,C Sports hall lighting control


Garage lighting control Paper towel change over Totals


Initial cost Installation £3,600.00 £1,485.90


£5,280.00 £3,960.00


kWh


Annual electricity savings Cost saving CO2


(tonnes)


Annual gas savings kWh CO2


33,200


105,500 23,880 11,248


£6,120


£1,406.52 £662.50


£4,024.00 125


12.42 5.85


35.53


(tonnes) 6


9,240 Figure 1: Energy efficiency improvement measure in 2010, with estimated savings


at cutting waste and improving efficiency in the tower and the three wings (see Figure 1). The changes included improvements to lighting systems and ongoing reviews of heating and plant operations. The payback periods for these measures


varies widely. The most expensive measure, at £5,280, is the plant room lighting control – with a payback period of 2.5 years. Installing a PIR lighting system in the meeting rooms will cost £3,960 and take four years to pay for itself. However, most of the measures centre on relatively low-cost reviews of the effiency of heating and plant operations. The estimated annual savings from the


eight measures total nearly 140,628 kWh of electricity and 33,200 kWh of gas – providing estimated cost savings of £12,200 a year. The overall cut in carbon emissions is calculated at 111 tonnes of CO2 per year.


Measure Electricity


savings estimate (kWh/yr)


Implemented measures Project list 2010


Sub total Shorter term payback measures:


Staff engagement initiative Building management system scheduling and control review


Sub total Medium term payback measures


Replace T8 with T5 in wing offices Reduce the PIR delay time in open plan offices, meeting rooms and circulation areas


Sub total Total


200,000 18,300


218,300 1,098,928 0 973,200


107 10


117 770 Figure 2: Recommended further initiatives with timescales, projected payback periods and expected savings to be made


18,000 1,600


19,600 128,100


65,000 6,000


71,000 118,240


3.6 3.8


3.6 0.9


296,000 444,000


740,000


376,00 564,00


940,000


229 343


571


37,990 56,900


94,800


3,000 35,000


38,000


0.1 0.6


0.4


Gas savings estimate (kWh/yr)


Carbon dioxide saving


(te CO2 /yr)


Staircases The refurbishment also included work on the staircases. Measurements indicated that lighting levels in the staircases of the wings and tower areas were within recommended values of 300 to 400 lux. Although the lighting equipment is reasonably efficient, there is potential to change the installation by removal of fittings to achieve further energy consumption savings. Lighting consumption in the staircases is estimated to be 232,000 kWh of electricity annually. With lighting fitting densities reduced by 50% in the staircases areas while still maintaining normal illumination standards of 300-400 lux, there would be a saving of 105,500 kWh a year. The assessed cost savings are £6,120 pa.


Further action Power Efficiency recommended a range of further energy saving measures that


Cost saving (£/yr)


Guide price (£)


Simple payback perid (yrs)


140,628


12,213


179


33,200


140,628 140,628


33,200 33,200


82 82


13,700 13,700


9,240 9,240


0.7 0.7


34


CIBSE Journal May 2011


www.cibsejournal.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84