Safety Steps & Platforms Aluminium Stepladders
Extra large standing platform, 50% bigger than standard stepladders. • Strong deep anti-slip treads and platform provide a secure footing. • Twin safety handrails and guardrail for added comfort and security. • Handy work tray to store tools and equipment. • Lightweight and portable combined with a sturdy construction. • Platform handrail provides support when working. • Platform to handrail height 750mm (8 Tread - 670mm). • Workload capacity: 150kg. • Conforms to BS EN-131 (8 Tread - BS 2037 Class 1).
Code Treads Platform Height Weight PS11/2 PS11/3 PS11/4 PS11/5 PS11/6 PS11/7 PS11/8
2 3 4 5 6 7 8
350mm 580mm 800mm 1030mm 1250mm 1480mm 1790mm
4.3kg 5kg
5.8kg 6.5kg 7.5kg 9kg
9.7kg
Price £85.95 £93.95 £108.00 £121.00 £160.00 £193.00 £225.00
Glass Fibre Platform Steps Non-conductive glass fibre construction
ideal for professional use. • Strong glass fibre construction with serrated aluminium treads.
• Large stable aluminium work platform. • Fitted with tough anti-slip rubber feet and integrated tool holder.
• Insulated to 25,000 volts. • Workload capacity: 150kg. • Conforms to BS EN-131.
Platform
Code Treads Height Weight HA98 4 HA98A 5 HA98B 6 HA98D 8 HA98E 10
950mm 8.4kg 1180mm 9.8kg 1420mm 11kg 1880mm 13.9kg 2340mm 17.1kg
HA98D
Price £220.00 £260.00 £295.00 £355.00 £395.00
Heavy-Duty Platform & Swingback Steps
Suitable for the rigours of heavy trade and industrial use. • Heavy-duty steps providing strength and safety when in use. • Conform to BS 2037 Class 1. • Deep treads with chequer plate on platform steps provide a secure footing. • Large slip-resistant feet for safety and security. • Workload capacity: 130kg.
Swingback Steps
Code Treads Top Tread Height Weight KE02A 5 KE02B
6
KE02D 8 KE02E KE02F
Platform Steps
10 12
KE02G 14 4
1040mm 1270mm 1730mm 2190mm 2660mm 3120mm
KE03A 5 KE03B 6 KE03D 8 KE03E KE03F
10 12
800mm 1040mm 1270mm 1730mm 2190mm 2660mm
4.7kg 5.5kg 7kg
8.7kg 11kg
12.8kg
Code Treads Platform Height Weight KE03
5.8kg 6.5kg 7.3kg 9kg
11.3kg 13.1kg
5 Way Combination Ladder Can be used as a stepladder, extension ladder,
Price £135.00 £153.00 £188.00 £223.00 £264.00 £295.00
Price £180.00 £195.00 £205.00 £215.00 £295.00 £325.00
Economy Platform Steps Lightweight steps ideal for offices, storerooms and
• Ribbed, non-slip treads and platform for secure footing.
• Platform handrail provides support when working.
• Platform to handrail height 600mm. •Workload capacity: 150kg. • Conforms to BS EN-131.
Code Treads Platform Height Weight KE04A 3 KE04B
4
KE04C 5 KE04D 6 KE04E KE04F
7 8
580mm 800mm 1030mm 1250mm 1480mm 1750mm
2.9kg 3.4kg 3.9kg 4.6kg 6kg
7.2kg
Price £76.40 £85.05 £96.65 £113.00 £129.00 £147.00
KE04A
light maintenance work. • Lightweight and portable combined with a sturdy construction.
KE04E
Swingback Steps
Platform Steps
stairwell ladder, level platform and a stair platform. • Unique sliding mechanism for easy conversion to all five combinations.
• Wide splayed base and heavy-duty feet for stability and grip. • Stabiliser bar for added stability. • Lightweight aluminium platform. • Suitable for professional use. • Workload capacity: 150kg. • Conforms to BS EN-131.
Code Stepladder Top Extension AST129 1560mm
Rung Height Ladder Length Platform Size (LxW) Weight 2740mm
Maximum Platform Height 1200mm
12.9kg
Price £275.00
Can't find what you're looking for? Give us a call 209
Handling, Access & Storage
Best seller
New range
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164 |
Page 165 |
Page 166 |
Page 167 |
Page 168 |
Page 169 |
Page 170 |
Page 171 |
Page 172 |
Page 173 |
Page 174 |
Page 175 |
Page 176 |
Page 177 |
Page 178 |
Page 179 |
Page 180 |
Page 181 |
Page 182 |
Page 183 |
Page 184 |
Page 185 |
Page 186 |
Page 187 |
Page 188 |
Page 189 |
Page 190 |
Page 191 |
Page 192 |
Page 193 |
Page 194 |
Page 195 |
Page 196 |
Page 197 |
Page 198 |
Page 199 |
Page 200 |
Page 201 |
Page 202 |
Page 203 |
Page 204 |
Page 205 |
Page 206 |
Page 207 |
Page 208 |
Page 209 |
Page 210 |
Page 211 |
Page 212 |
Page 213 |
Page 214 |
Page 215 |
Page 216 |
Page 217 |
Page 218 |
Page 219 |
Page 220 |
Page 221 |
Page 222 |
Page 223 |
Page 224 |
Page 225 |
Page 226 |
Page 227 |
Page 228