This page contains a Flash digital edition of a book.
Ener
Powercall provides ‘power
gy Solutions
within the hour’ cover to
Magdalene for Geo contract
Emergency generators support Magdalene’s collaborative
company, Powercall UK, has sealed a deal partnership with Geo covers all
with independent telecom services phases of the network lifecycle – from of a prolonged power cut. Powercall UK
provider, Magdalene. The five year contract initial needs definition through to project has enabled us to meet this criteria”.
follows the signing of an agreement implementation, acceptance and network Powercall UK’s network of standby
between Magdalene and leading fibre operations (first and second line generators is available throughout the UK
networks solutions provider, Geo, to maintenance and network monitoring). on 24-7 call out. Since it was launched in
handle a fully managed service supporting The company’s total reliance on protecting January 2005, Powercall has received a
Geo’s fibre network and ancillary its network from power outages and large number of enquiries and orders from
infrastructure. As part of this agreement surges means that a continuous, reliable, a wide range of companies including other
Powercall UK is providing its emergency power source is especially critical and its major telecom networks, healthcare
callout generator service to 21 Geo dependence on standby power is a vital organisations, universities, local authorities,
network sites around the UK. element in its customer service. care homes and other multi-site
The contract ensures that all Geo “With so many sites it would neither be applications. With the demand for
network sites will have secondary back up practical nor cost effective to install emergency power set to grow at 7% per
power provided by Powercall’s nationwide secondary standby power at each of Geo’s annum over the next five years, and with
generator network in case of mains failure. sites”, says Darrel Wainwright, General predictions of more extreme weather and
The network is serviced by a 24/7-control Manager Network Operations at a less secure mains power supply
room, which despatches a generator from Magdalene. “An integral part of the Powercall UK is finding a high demand for
a local depot with a target time of less contract has been our ability to its service.
than one hour and a guaranteed demonstrate that we can quickly and cost Email: info@shentongroup.co.uk
commitment to a maximum of three effectively provide secondary standby www.shentongroup.co.uk
hours. power to support Geo’s sites in the event
NICEIC Contractors -
best in the business
It’s worth remembering that most UK Local Authorities, Housing
Associations and Property Managers specify NICEIC contractors.
“We wouldn’t get a look in
Complex Building Regulations and higher quality standards mean
with work like this if we
specifiers need total peace of mind – and there’s no better choice
than an NICEIC Approved Contractor.
weren’t NICEIC approved.
Along with the 25,000 contractors already registered in the UK, you will find us
Our clients can always
friendly, down-to-earth with a real understanding of your industry, the pressures
of time, limited budget and the increasingly complex legislation.
trust us to do a good job
We offer a wide range of training, certification and technical support along with
and that’s thanks to
a load of added value benefits to make your work life easier.
NICEIC.”
To find out more click or call
Shakil Hussain
www.niceic.com
Streetly Electrical Services Ltd,
Sutton Coldfield
0870 013 0382
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28
Produced with Yudu - www.yudu.com