This page contains a Flash digital edition of a book.
Building Fabric:Layout 1 01/07/2009 13:08 Page 32
building fabric
Hub for budding engineers
An unconventional design involving a “re-imagining” of how composite panel technology can
be used was devised for a new technology centre in Nottingham.
A
RCHITECTS Hawkins\Brown wanted weight,” explains project architect Jeremy
to avoid the “bland suburban Walker. “The panels have a variety of
structures often found in surface finishes and come in remarkably
technology parks” in creating Castle large sizes so there are few breaks.”
Education partners
College’s Highfields Automotive and For the Hub, Walker specified curved
Engineering Training Centre at panels. Kingspan’s architectural wall
HIGHFIELDS has been funded by a
Nottingham Science Park. The design, panels meet a diverse range of cladding
regional project partnership including
which comprises a pair of two-storey solutions whilst providing consistent
East Midlands Development Agency,
wings slightly converging towards a ‘blob- thermal performance and air tightness.
Learning and Skills Council
shaped’ entrance structure known as the Blueprint, the developer of the Highfields
Nottinghamshire (LSC) and Nottingham
Hub, required multi-coloured cladding to Training Centre, has stated its aim to
City Council with support from
the first floor of the wings and part of reduce CO2 emissions by 60% at the new
Castle College.
the Hub. This distinctive central area training establishment.
The 6,600sqm building is shared by
houses the reception area, cafe and
the College and Toyota, who between
library, and the two wings contain car
them will educate a range of people
parking, training rooms and workshops. www.hawkinsbrown.co.uk
from industry professionals to school
A built-up system, consisting of a metal
children. The collaboration between
sub-frame with insulation and resin-
www.kingspanpanels.com industry and education will fill a sector
impregnated timber-fibre rainscreen
skills gap that was identified by the
cladding, was rejected in favour of KS600
project partners who want the Centre
and KS900 MM Mini-Micro architectural
to help further develop the region’s
wall panels from Kingspan. These were
automotive retail, manufacturing and
provided with integral coloured finish in
engineering sector base.
Moorland Green, Linden Green and Yellow.
“The system provided economy and
speed of construction, required less
Above: Castle College’s new training centre.
substructure and had a lower self- Photo: Redshift Photography.
32 edbmagazine.co.uk
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84
Produced with Yudu - www.yudu.com