This page contains a Flash digital edition of a book.
30:Layout 1 02/07/2009 11:08 Page 30
Recent Gartec projects include:
Albany Science CollegeAlbany Science College New Hall SchoolNew Hall School
Having prHaving previously installed threviously installed three liee lifts for Albany Science fts for Albany Science Noted for its imprNoted for its impressive heritaessive heritage and ge and
College, Gartec was asked to deliver DDA access to College, Gartec was asked to deliver DDA access to excellent purpose-built facilities, New excellent purpose-built facilities, New
two further blocks in the school. two further bloocks in the schoolschool. Hall School turHall Schoool turned to Gartec to prned to Gartec to provideovide
DDA access in the new changing-rDDA access in the new changing-room oom
Because Gartec platform lifts arBecause Gartec platform lifts are compact ane compact and rd requequiriree
block of the school’block of thet school’s ss sports arports area.ea.
virtually no building work to install, valuable teaching virtually no building work to install, valuable teaching
space wasn’space wasn’t wasted and the prt wasted and the project was comoject was completed ppleted The platform lift had to be in keeping with the moderThe platfoorm lift had to be in keeping with the modern, n,
without any disruption to school life.without any disruption to school life. open plan surropen plan surrounoundings, so we specified it glazed on all dings, so we specified it glazed on all
sides and encased in a sleek white steel shaft. sides and encased in a sleek white steel shhaft.
Current pupils arent pupils are alre already benefiting and the new lifts eady benefiting and the new lifts
open up possibilities for futuropen up possibilities for futuree student intake.student intake. The lift is used by pupils and stafThe lift is used by pupils and staff and was such a f and was such a
success that another is planned for a new thrsuccess that another is planned for a new three-floor ee-floor
“ “The school is very pleased with the lifts The school is very pleased with the lifts
classroomoom block.m block.
and the whole prand the whole project”oject”
AnAndrdrew Cywinski ew Cywinski
Building SurveyorBuilding Surveyyor, Lancashiree County Council
Call us for your frCall us for your free brocochurhuree on on 01296 39710001296 397100
or visit or visit www.gartec.com.gartec.com
www.enquire.to/edb 518
Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84
Produced with Yudu - www.yudu.com