search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
offsite/modular


Crown Student Living opts for bathroom pods at Swansea


O


FFSITE Solutions, the UK’s leading bathroom pod manufacturer, has been awarded a £1.6m contract


for Crown Student Living. Crown Place in Swansea will be Offsite Solutions’ sixth and largest student accommodation scheme for the developer and brings the total value of its projects for Crown Student Living to £6.8 million. Offsite Solutions will manufacture 645 GRP composite bathroom pods working with Midas who are main contractor for the £40m scheme on Swansea’s waterfront. All the bedrooms in the nine- storey development will be ensuite and furnished to a high standard. Designed by ECE Westworks, Crown Place will have shower rooms with a tile- effect wall finish, a large mirror, wall cabinet, contemporary dark bamboo-style flooring, and specially-designed access for ease of maintenance. The ensuite shower pods have been designed by Offsite Solutions in collaboration with Crown Student Living.


The waterside scheme will have an extensive range of communal facilities including an on-site gym, cinema, hotel- style lounges and 1,000 sqft of


commercial space. The Swansea project awarded to Offsite Solutions follows its earlier student schemes for Crown Student Living in the university cities of Bristol, Reading, Cardiff, Portsmouth and most recently Norwich, which is nearing completion. Commenting on the use of bathroom pods, Alan Pulver, Director of Crown Student Living, said, “Our aim is to create an exceptional student experience which is reflected in our approach to bathroom construction. The quality of the ensuite shower rooms is definitely a significant factor in students’ choice of accommodation – which can be their home for up to three years. We have specified Offsite Solutions’ bathroom pods from our very first development – a refurbishment and conversion project in Bristol – and for every scheme after that. We have established a very good and positive working relationship with their team. “This use of offsite construction allows us to have every ensuite built to the same exacting quality standards. It also gives us the benefit of a much shorter programme than in-situ bathroom construction. There is no assembly on site, only M&E


connections which are extremely efficient and fast. We like dealing with Offsite Solutions and would never consider traditional bathroom construction for any of our schemes.” Offsite Solutions offers a large range of


bathroom pods to suit different building types and applications. Options include steel-framed pods with porcelain-tiled finishes for high-end apartments and hotels; robust and low maintenance GRP composite pods for student accommodation, care homes, social housing and healthcare; hybrid pods for specialist projects, and award-winning demountable GRP pods for ease of installation in refurbishment schemes.


www.offsitesolutions.com highereducationestates 35


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37