projects
Planning approval for University of Lincolm’s £21m medical school
P
LANS for a new, £21m medical school building at the University of Lincoln (UoL) have been approved,
providing a significant, new opportunity for medical students to study in state-of- the art-facilities in the UK. Perfect Circle – a consortium comprising Pick Everard, Gleeds and AECOM – is delivering project management, cost management, BREEAM consultancy services and design services for the scheme at UoL, located at the Brayford Pool Campus, Lincoln. The provision of these services have been enabled by the Scape National Built Environment Consultancy Services (BECS) framework. The new, five-storey building is due to complete in spring 2021 and will comprise: lecture theatres; laboratories; clinical and prosection anatomy suites, equipped with cutting-edge diagnostic tools; and a science library. Mock consultation rooms in the clinical suite will allow students to experience real life situations encountered by those in the medical profession, using the latest technology.
Victoria Brambini, managing director of Perfect Circle, said: “This new facility marks a significant step-change in the provision of state-of-the-art training for the next generation of medical professionals. As well as inspiring future medical professionals, this exciting development will support the government’s efforts to address the NHS’ skills shortage. The medical school will play an important role in driving the local economy and will transform the campus.” With aspirations to reach carbon neutrality, the building has been designed to meet BREEAM Excellent standards, with features including a living wall and photovoltaic panels.
In March 2018, UoL and the University of Nottingham announced an exciting collaboration to provide a medical education for students across Lincolnshire, providing more
opportunities and a high-class education. Through this innovative partnership, students will study for a University of Nottingham Bachelor of Medicine Bachelor of Surgery (BMBS) medical degree at the UoL site, which is set to open its doors to its first intake of 95 students in September 2019.
www.perfectcircle.co.uk
£24m accommodation project at Arts University Bournemouth by August 2020
A
RTS University Bournemouth (AUB) this week held a ceremony to break-ground on a new student
halls of residence.
The accommodation will be home to 300 students and is situated on AUB’s Wallisdown campus. Designed to fit in with the campus’ cutting-edge design aesthetic, the building will feature eight- bed clusters with communal kitchens and dining areas centred around a landscaped
courtyard. The high quality accommodation includes roof-top solar panels, assisting in reducing the building’s energy demand, leading the way in sustainable living. The building has been designed by Design Engine Architects, which has created many of AUB’s existing and award-winning buildings. The development boasts impressive sustainability credentials to benefit both students and local residents. The design
includes upgrading the pedestrian and cycle routes that connect nearby areas. Specifically, this will involve linking Wallisdown Road and Gillett Road to Fern Barrow and significant public lighting design improvements. Morgan Sindall Construction were appointed as developers through the Southern Construction Framework (SCF), which ensures projects are delivered with social responsibility and transparent procurement procedures. Perfect Circle (AECOM) were appointed via the Scape Group’s National Built Environment Consultancy Services framework and are leading the multi-disciplinary team on this exciting project.
The student accommodation will be built to a high design spec, and provide a high living standard for those who are accommodated on campus. The project supports AUB strategic goal of becoming the leading professional arts university, and is due to be completed in August 2020.
www.morgansindall.com
www.designengine.co.uk
12 highereducationestates
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37