search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
modular


Modular buildings specialist to deliver Swansea teaching facility


S


WANSEA University has chosen a Wernick building for its Bay Campus. A two-storey, 60 module building on Swansea University’s prestigious Bay Campus will be built offsite, using the latest innovations in modular design and build. Modules will be manufactured in a quality-controlled factory environment in six weeks, with ground works on campus taking place simultaneously. Handover is scheduled for November 2019 – an end- to-end build programme of just 22 weeks. The building, procured through Fusion


21’s Education and Modular Buildings Framework will accommodate multiple departments and over 1,000 students. It utilises Wernick’s latest modular system – Swiftplan®


. As well as ensuring building


efficiency, the system allows for greater versatility for the addition of architectural features. The university building takes advantage of this versatility; curtain walling will provide open, sun-drenched areas and rain screen cladding will give it a contemporary feel. Swiftplan’s®


non-combustible wall-


panelling system will ensure an extra level of safety, and a hybrid natural ventilation system will provide a comfortable environment for occupants. The comprehensive interior fit-out includes


24 highereducationestates


folding partitions to create flexible spaces, lecture suites, PC labs and quiet zones. The H-shaped structure will sit alongside a range of pioneering buildings on the campus, including the UK’s first energy positive office – the “Active Office”, conceived and designed by SPECIFIC Innovation & Knowledge Centre and delivered by Wernick in 2018. Like the Active Office, manufacture of the new teaching facility will take place at the Wernick Buildings factory in Port Talbot – right across the water from the Bay Campus. While the principal driver of a modular solution is time, the method presents a range of environmental benefits too. For example, up to 90% fewer vehicles arrive on site and less waste for landfill is produced at each stage of the build. Concrete and plaster use is significantly reduced as are CO2 emissions from on- site generators. Wernick’s modular buildings promise 60-plus years design life while offering the flexibility to relocate or re-configure the building if required. Flexibility, plus accelerated build-times, make modular buildings a perfect fit for the higher education sector - colleges and universities can respond to an influx of students or refurbishment work elsewhere


on campus – all while causing minimal disruption to surrounding areas. Stuart Wilkie, Managing Director at


Wernick Buildings, said: “We are delighted our local university has once again selected Wernick to deliver their new teaching accommodation. Higher education institutions such as Swansea University are leading the way - embracing modern methods of construction and all that modular buildings have to offer.” Ian Macpherson, Associate Director - Estates & Facilities Management at Swansea University, said: “We are very pleased to have appointed leading modular building supplier Wernick to deliver this new teaching accommodation at our Bay Campus. “The new facility will provide additional teaching and learning environments to accommodate our growing student population, as well as offering flexible space to support a range of non-teaching activities and events to enhance the student experience here at Swansea.”


www.fusion21.co.uk www.wernick.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37