building services


Keele University optimises heating efficiency with new boilers


expenditure and quality to reliability and good service support” said Dave. Given the rooftop location of the


plantroom at the David Weatherall Building, the modular design brought logistical and financial benefits when it came to positioning the boilers. The six Quinta Ace 160 boilers were transported to the rooftop in the lift, where they were installed on a neat, ultra-compact back- to-back cascade system. “The reduced footprint of the Remeha


Quinta Ace 160 meant that we avoided having to crane the boilers into the plantroom which would have incurred additional costs” explained Dave. Installation was quick and easy for


R


EMEHA Quinta Ace 160 boilers have been installed at the Faculty of Medicine and Health Sciences at Keele


University to optimise heating efficiency and minimise environmental impact. Improved sustainability is a key


strategic aim for the university. One of the ways in which they address this is by ensuring that the heating service operates as efficiently as possible. This includes upgrading any older boilers to newer, more energy-efficient equipment. Condensing boilers are around 11%


more efficient than non-condensing boilers. Replacing non-condensing boilers with condensing boilers therefore offers considerable scope for energy savings and carbon reduction. But even condensing models should be routinely replaced when they come to the end of their lifecycle to ensure optimum operation and efficiency. When the time came to upgrade the


two ageing Remeha 3A boilers and one non-condensing HE boiler serving the David Weatherall Building, the university was quick to act. The first requirement was to achieve high energy efficiencies and reduced NOx


and CO2 emissions in compliance with Building Regulations. Access was a potential obstacle due to


the rooftop location of the plant room. The university was also keen to achieve


the heat demand as efficiently and effectively as possible, avoiding any disruption and ensuring a comfortable environment for improved wellbeing and productivity. To meet all these requirements, Ford-


Mainwaring’s Dave Alcock chose to install multiple boilers in a modular arrangement rather than select “like for like” larger units. This configuration increases the turndown ratio which enables fluctuating heat load to be more accurately matched, improving seasonal efficiencies and reliability. Additionally, it allows the condensing boilers to operate at part load where they achieve their higher efficiencies. Ford-Mainwaring’s project manager


Paul Brett, supported by Jon Lewis of Heatech, selected six Quinta Ace 160 boilers on a preassembled Remeha cascade system. “We are familiar with Remeha products,


and the Quinta Ace 160 boilers fitted all the requirements, from capital


contractors Ford-Mainwaring thanks to Remeha’s time and labour saving comprehensive cascade system. As a result, changeover was rapid with minimal disruption. Good control keeps heating efficiencies


high and emissions low. To achieve this, the new Remeha boilers have been integrated into the existing Building Management System at the David Weatherall Building. Ash Hulme, Head of Engineering and


Planning in the Estates and Development Directorate at Keele University, said: “The project went extremely well, resulting in a neat installation that delivers the required high performing heating service and reduced environmental impact”. “The design allows easy access to the


boilers while the inbuilt redundancy makes servicing and maintenance simpler and the heating service more secure and reliable. As the lead boiler is rotated, the lifecycle of the boilers is also extended, all of which improves whole life operational costs.”


remeha.co.uk highereducationestates 35


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39