search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
project profile


or ribbed’ anti-slip tiles. “Firstly, the tiles have an antibacterial effect


slip resistance combined with easy cleaning for a hygienic environment, has never been found. As pool design specialists, we are constantly looking for new and/or improved products and/or combinations of products and applications that can get as close to the ultimate solution as possible,” says Swift.


After researching recent product


developments in the floors specified for use in hospital and food production facilities, the architects proposed a combination of ceramic tiles designed for use in wet (pool) change areas and an innovative HT coating which offer multiple advantages over standard structured


making them easy to clean and capable of eliminating odours. The coating decomposes bacteria, fungi and germs and prevents the development of new pathogens. Secondly, the HT coating makes the tile surfaces hydrophilic, water is not repelled but spreads to form a thin film on the surface. In this way, dirt is naturally


Facilities Ground floor:


• Reception including admin offices and a staff room


• Café with poolside viewing


• 25m 8 lane RSC (Regional Short Course) pool with a moving floor


• 15 x 8m learner pool • Spectator seating • Sauna and steam room


• Wet village change including group change


• Public male, female, disabled WCs and baby change/feeding area


First floor: • Fitness suite (100 stations) • Exercise studio • Group cycling studio • Dry changing rooms Second floor:


• National standard ice rink with capacity for 1,200 skaters


• Rink-side spectator seating for up to 1,000 people


• Changing facilities • Skate hire facilities • Café • VIP viewing area Third floor: • Tiered spectator seating • Office/control room


pactfacilities.co.uk 17


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41