33
Tackling excess cold A tired window frame or a failed sealed unit directly causes excess cold. Under Awaab’s Law, a failed window or door requires immediate action. If left unchecked, it will not only appear on the same damp and mould report each winter, but it will likely contribute to fuel poverty and undermine the health of the residents. The solution must support Approved Document L and meet the excess cold threshold. Combatting excess heat With record summer temperatures becoming the new normal, excess heat is a major addition to the HHSRS hazard categories. Restricted or non-functional window openings that fail to provide adequate purge ventilation will trigger compliance issues during heatwaves. Adequate openable areas help manage overheating risk under Approved Document O. Select appropriate replacements While these hazards require a rapid performance for speed. Replacing a failed window with another poorly issue, but it does nothing to stop it recurring, or to guard against other Phase 2 hazards. Instead, landlords between a like-for-like and an
vital for eliminating risk and achieving long-term compliance. The correct glass
help manage excess heat, implementing restrictors and PAS 24 multi-point locking systems support fall prevention and enhance security, and balancing U-values with trickle ventilation Trusted approved partners As with Phase 1, processes are fundamental for compliance with Phase 2. In addition to common place procedures and checks, there are also those that apply directly to windows and doors. Landlords need trusted approved partners who can deliver high- performance, quality products, quickly, within Awaab’s Law timescales, not just planned maintenance cycles. Fabricator capability therefore must be built into the vetting process. Often, window and door systems houses can connect landlords with approved fabricators, for ease and peace of mind.
Housing providers should bring in hazard is reported, not after. These specialist partners can assist with the project requirements with experienced commercial fabricators, ensure evidence is supplied in the format needed and provide ongoing support as Phase 3 approaches. supply chains and maintenance processes now will be far better placed to protect residents and meet statutory obligations as Awaab’s Law continues to evolve. Further guidance and resources For detailed technical guidance and a complete readiness checklist, download the white paper at
WJ234
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44