search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
PHAM NEWS | NOVEMBER 2024 Your Views


Star letter Share your views and you could win £100 for writing the star letter


Building the slums of tomorrow


The new government’s pledge to build 1.5million houses is a great ambition, but no consideration has been given to the size or capability of the current trained workforce or the materials available – or land for that matter.


I don’t really think the potential


workers of today really want to put up with conditions on site. I spent the best part of 30 years on housing sites. Either covered in mud and freezing in the winter months or choking on dust in the summer. Who wants to do that in these modern times?


When I attended careers days in school


back in the late seventies there was no mention of the above. They also kept quiet about how working in these conditions would aff ect your body, knees, hips and backs being the most common ailments.


Often whilst working in a property a


group of three or four dry liners would appear wearing breathing masks with fi lters. They would proceed to go through each room rubbing down the joints between the boards, both wall and ceiling. We were never warned or supplied with any safety kit. When they left there would be a layer of dust over everything from materials to tools. When I complained I was informed it was only silicon dust so couldn’t do me any harm. I think the same was once said about asbestos.


If you want to build houses in numbers,


surely the best way to go is modular. Build them in factories where quality can be maintained and the weather does not infl uence production. Deliver to site on to pre-made foundations, seal and connect. I have been doing this for a number of years on holiday chalets and each is ready for occupation within a week of arriving on site.


The other problem is materials. When I


fi rst started, the plumbing was in copper and boilers were mainly cast iron – these were materials built to last and still look good 50 or 60 years down the line. There was little to go wrong. Taps just needed a change of washer, boilers a new thermocouple.


What is the point in rushing to put up


dwellings if they are likely to need major refurbishment or even demolition in twenty plus years? It’s a false economy that will ultimately fall on those who own the buildings. Indeed, there is a high chance the building will need redeveloping before the mortgage is paid off .


I’m not a Luddite. Many things have


improved. Insulation, windows, push fi t pipe, more effi cient boilers and radiators, etc, but the houses today need to be quality, built by skilled tradesmen with quality materials. After all, the houses of tomorrow are going to have to deal with greater extremes of weather than we have had in the past. Otherwise in 20 years time we’ll be pulling them down as it will make better fi nancial sense than trying to get them back up to standard. Surely building 300,000 well is better than 1,500,000 badly that will need a massive budget


to maintain – of course by then it will be a diff erent government’s responsibility.


If the government really wants to help the industry, especially the plumbing and heating sector, then try standardising fi ttings. A maximum of three diff erent fl ush valves, or if not then a standard fi tting on the base so any valve can be changed without taking the cistern apart. Is this really so diffi cult? I would also like to see a ban on single piece siphon valves so diaphragms can be changed with ease.


In conclusion, quality not quantity. I


visited my fi rst site just before Covid and there were still properties with the original Marley guttering I installed 40 years ago. I have been removing boilers seven or eight years old as it makes more fi nancial sense than trying to source and fi t parts. What is the life expectancy of a heat pump? Will they still work once submerged in fl ood water, being as they all seem to be fi tted at low level externally?


Are we building the slums of tomorrow


today? I sincerely hope not but only time will tell.


W. Wiltshire Via email


Three replies


In reply to three readers’ letters in September PHAM News. First of all, Mark Krull of Greenpeace thoughtlessly pleads for all heating apprentices to be taught low-carbon fossil-free technologies from their fi rst day of training. Currently they learn gas/oil boilers principally and may then choose to ineff ectively save the planet by participating in the great zero carbon scam with dysfunctional heat pumps in our damp British weather. Apprentices should be lighting gas, not be gaslit about imaginary global boiling and tipping points.


PHAM’s second contributor, R.S. Watt


of Aberdeen, is clearly a fi ne plumber and valuable rectifi er of cowboys’ wreckages. However his disastrous recommendation to tighten plumbing regulation would only encourage the empires of box-ticking civil servants to grow even further. See Gas Safe Register’s wholly unnecessary boiler registration scheme which exists simply to snitch each fi tter’s likely turnover and tax liability to HMRC. Boiler manufacturers save lives, not the Gas Safe Register. If R.S. Watt wishes to serve his customers well he should encourage non-governmental Check-a-Trade type schemes. As the libertarian Mark Passio implores: keep money-sapping bureaucrats well away from useful and productive people!


And fi nally: Hep-hep-hooray to Petr Knichal


for his interesting insights into the short lifetime of dry waste traps. Thank you Petr.


George Robinson Kenilworth


Let us know what you think...


Please address your letters to: The Editor, PHAM News 1b Station Square Flitwick, Bedfordshire, MK45 1DP


or email to: editor@phamnewsedit.co.uk ZILMET UK LTD.


Airfield Industrial Estate, Hixon, Staffordshire, ST18 0PF t. 01889 272185 e. sales@zilmet.co.uk www.zilmet.co.uk


THE NEW RANGE OF ZILMET BUFFER VESSELS WHERE EFFICIENCY MEETS RELIABILITY


Inta Zil-B Buffer Vessels are designed to store thermal energy generated by a heat pump system for later use when required.


Zil-B Buffer Vessels are manufactured to the highest quality and standard, to ensure they maintain optimum system performance, helping to enhance the heat pumps overall efficiency.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48