search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
MOVING & LIFTING VERTICAL HANDLING: MOVING AWAY FROM THE TRADITIONAL


P


rior to its investment in an EffiMat® storage and retrieval system, OFI Testing Equipment (OFITE) relied on eight employees manually selecting sales and work orders. At times people were waiting for an aisle to clear so they could get the parts they needed and it was the same, in reverse, for re- stocking the inventory every morning.


Instead of adding shifts or expanding the building to improve efficiency, OFITE decided to automate the selection process and clearly the most practical solution was to use existing floor space optimally and think ‘vertical’. The initial plan was to invest in a traditional vertical lift module (VLM) but then Dan Wax, director of Supply Chain and Logistics at OFITE, saw an EffiMat system at a trade show and immediate grasped the time and cost saving potential of its patented Box Mover Technology.


“To say that I was impressed is an understatement,” he said. “I even took a sales engineer representing a traditional VLM company to the EffiMat stand to ask if his machine could do the same.”


The main difference between a traditional VLM and an EffiMat is its efficiency when picking multiple parts. If an operator has a kit of parts to produce and each is located on a different shelf, he or she would have to wait for each individual shelf to be presented, typically taking around 60 seconds every time. Occasionally, the operator might get lucky and find two of the required parts located on the same shelf.


EffiMat, available in the UK from RARUK Automation, stores parts in individual boxes and allows the user to select up to five boxes to be presented simultaneously. Even though the cycle time is slightly longer, at 80 seconds, efficiency is many times greater as each cycle delivers five products. Typically, up to 250 boxes/picks per hour can be achieved and boxes can also be sub-divided to further enhance productivity.


This capability was a clear vote-winner for OFITE management but the company was also keen to reassure its employees that such an investment would benefit them too. As a result, OFITE arranged visits to other EffiMat installations so staff could see for themselves how the EffiMat improves the working environment and reduces the tedium of order picking. Now installed, the OFITE EffiMat is used for storage and handling of smaller and expensive parts inventory used to fulfil direct sales and work orders to build finished products. It is interfaced with the company’s ERP system for order processing and is currently responsible for more than 3000 part numbers.


Three people operate the EffiMat at any one time which means other order FACTORY&HANDLINGSOLUTIONS | JULY/AUGUST 2020 37


picking staff can be deployed to different tasks. Also, the company has gained a lot more open floor space thanks to vertical storage, which is now used for collating large orders.


Greater efficiency and cost savings have resulted from this investment and Wax confirms EffiMat has become an essential part of the company. He said: “It is rewarding that the EffiMat is one of the stop-off points for visitors to our factory. It wows people.”


RARUK www.rarukautomation.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54