MONITORING & METERING FEATURE


Monitoring an energy self-sufficient water reclamation plant


The Tuas Water Reclamation Plant (WRP) has a treatment capacity of 800,000m³ per day and will ensure Singapore’s water security through the reclamation of used water


ABB is delivering a site-wide plant monitoring and control system for the


Tuas Water Reclamation Plant in Singapore, which has been conceived as a compact and energy self-sufficient installation


P


UB, Singapore’s National Water Agency, has awarded ABB a contract worth around


$30 million (S$40.5 million) to deliver a complete site-wide plant monitoring and control system for the Tuas Water Reclamation Plant (WRP). The WRP has a treatment capacity of 800,000m³ per day and will ensure Singapore’s water security through the reclamation of used water. The Tuas Water Reclamation Plant is part


of an integrated development known as the Tuas Nexus – a world-first greenfield development which integrates two complex facilities that bring water and solid waste treatment processes together to harness synergies of the water-energy-waste nexus. With a footprint that is said to be more than


30% more compact than conventional plants, the Tuas WRP is a key component of the second phase of Singapore’s Deep Tunnel Sewerage System (DTSS), which is estimated to cost about $4.8 billion. It will receive used water flows from the western part of Singapore via two separate deep tunnels and apply membrane bioreactor (MBR) technology to treat and purify 650,000m3


/day of domestic


used water to generate NEWater, with a further 150,000m³/day of used industrial water treated and sent back to industries for reuse. MBR is a filtration process where membranes are used to separate different substances. NEWater is a high-grade reclaimed water produced from treated used water that is further purified using advanced membrane technologies and ultra-violet disinfection, making it ultra-clean and safe to drink. It is a


core pillar of water sustainability in Singapore. Peter Terwiesch, president ABB Industrial


Automation, said: “Water demand in Singapore is currently about 430 million gallons a day, with homes consuming 45% and industry taking up the rest. By 2060, the need for water is expected to almost double. To meet this demand, it is essential to close the water loop and ensure every drop is collected, treated, and reused. We are happy to support this quest to treat and purify water at the Tuas Water Reclamation Plant, and simultaneously help to manage and save energy needed in the process.”


VISIBILITY OF OPERATIONS Leveraging its ABB Ability 800xA control platform and Supervisory Control and Data Acquisition (SCADA), the company will deploy process control systems across multiple facilities at the site. The overall system will integrate over 100,000 input/output signals from different assets including pumping stations, a wet weather facility, biosolids, domestic liquid and industrial liquid modules, and product water storage, into one unified control platform – providing complete visibility of operations across the plant network. ABB will also deliver advanced process control solutions to improve plant performance and efficiency. Brandon Spencer, president of ABB Energy


Industries commented: “The Tuas Water Reclamation Plant has been conceived as a compact and energy self-sufficient installation. Our solution will enable a small


/ ENERGYMANAGEMENT


team of operators on site to gain complete visibility of operations and access to all process data to take decisions that optimise performance in real time.” Integrating a power monitoring system


alongside a building management system, operators will be able to monitor ventilation and air conditioning systems and, critically, manage energy utilisation across the site. Alarm monitoring and security systems will


also be deployed to help ensure industrial control, including cyber security solutions that assess threats and test vulnerability. Operator simulator training will be provided, and ABB service teams will provide continuous asset, system monitoring and preventative maintenance for a further eight years after construction is completed.


ABB “Integrating a power monitoring system alongside a building


management system, operators will be able to monitor


ventilation and air conditioning systems and, critically,


manage energy utilisation across the site”


www.abb.com


ENERGY MANAGEMENT | WINTER 2020


27


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36