search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
www.heatingandventilating.net


Coil repla = cost sa


T


he 500-bed hotel, located just a two-minute walk from the airport’s departure reception, has two international restaurants, a fitness centre with


swimming pool and a multi-storey central atrium home to its renowned Wine Tower Bar.


The hotel’s original air handling units had performed impeccably over many years, however condenser coils were showing signs of age. The company engaged CIAT UK to replace the coils with new CIAT units, designed and built to the manufacturer’s latest specifications. CIAT supplied 12 high performance, high efficiency aluminum and copper heat exchange coils, with its contract team managing removal of existing units and installation of the new systems as part of a turnkey refurbishment project.


“Coil replacement is a cost-effective alternative to total replacement of air handling units and can deliver a significant increase in performance in terms of energy efficiency and occupant comfort,” said Neil Hitching, Toshiba Carrier’s business development director. “Efficiency improvements not only boost performance and ensure guests and staff are kept comfortable at all times, they can also result in substantial savings in running costs that continue to accrue over the lifetime of equipment.”


Refurbishment is carried out in situ, saving from 50 to 65% of the cost of full plant replacement. It can also reduce additional onsite expenses associated with lifting equipment, possible road closures and access restrictions. Work can be phased to reduce disruption to buildings and occupants and help clients budget by completing projects in stages.


“Maintaining a high quality indoor environment at all times is vital to ensure the comfort of guests and deliver the best experience, whatever the season and whatever the weather outside”, said Simon Pearson, Radisson Hotel Group’s area chief engineer, UK and Ireland. “The air conditioning refurbishment project at Stansted is part of our ongoing programme of constant maintenance and upgrading, designed to deliver the highest standards possible across our estate of leading hotels.”


Air handling units


acement avings


CIAT UK has completed a turnkey project at the Radisson Blu Hotel at London Stansted Airport involving replacement of condenser coils at the heart of the hotel’s performance, high efficiency unit


Blu Hotel at London Stansted Airport involving air conditioning system with the latest high


www heatingandventilating net www.heatingandventilating.net


September 2020


15


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48