LOW CARBON HEATING


Stand-out low carbon community heating project


Coronation Square, a collaboration between heat transformation specialist Metropolitan and Taylor Wimpey, will deliver a regeneration project for Leyton that provides a decentralised, low carbon heating solution at the heart of its community


T


he development is located 0.4 miles northwest of Leyton Underground Station in the London borough of Waltham Forest and consists of 750 residential plots and 9,000m2 of


commercial space. Metropolitan provided a Net Zero ready heat network, with additional utilities being provided by sister companies, GTC and Power On. Services provided included a gas-fired CHP (700kW) and a decarbonisation plan to install two 500-kW air source heat pumps (ASHP) as the wider development builds out. Initially the project scope was to provide a more conventional gas CHP-led district heating system, however Metropolitan worked with Taylor Wimpey and the Council to agree a future decarbonisation strategy for the site, incorporating ASHPs. This meant that the energy system needed to be futureproofed to accommodate the lower temperatures at which ASHP networks are operated. Metropolitan’s early engagement in the


project ensured that Taylor Wimpey had timely and appropriate advice to help secure their planning requirements including the necessary decarbonisation strategy required by the Council and GLA. The Coronation Square project was secured by Metropolitan in January 2022 and work started on-site in February 2022, with first heat required from a temporary energy centre from September 2022. Under the current programme, heat will be supplied from a permanent energy centre in Spring 2023. As well as the new homes, Coronation Square will include a new civic square, with a market hall and retail and commercial space for existing and new start-up businesses. The scheme will benefit from a new health hub and pharmacy, a sports


and leisure complex for indoor sports with community facilities and meeting-room spaces, and a pre-school nursery. Metropolitan has been engaged to deliver both the design and build as well as a 40-year ESCo arrangement for this scheme. Phases 1 & 2, supplying heat and hot water to the 750 residential dwellings, plus to the non-residential properties on site, are well underway. The energy centre will be sized to accommodate a further 1,500 units, should neighbouring land be developed in the future. The initial scheme will benefit from gas-


fired CHP (700kW), but as referenced above, Metropolitan is working closely with the local


authority and GLA on a decarbonisation plan to install two 500kW ASHPs as the wider development builds out. Andrew White, Metropolitan managing


director, said: “The Coronation Square scheme showcases our on-site development strengths perfectly, especially when we are engaged at an early stage in a project. Not only do we offer a seamless service, delivered on time and within budget, but we also ensure we engage on a project at all levels, able to offer unparalleled advice and expertise because of our long experience. The decarbonisation plan put in place on this project is an example of this.”


James Silverthorne, Coronation Square project


director at Taylor Wimpey, said: “Metropolitan’s support was invaluable in ensuring our s106 requirements relating to the production of a robust decarbonisation strategy to satisfy the Council and GLA requirements for the energy system was fulfilled.”


22 BUILDING SERVICES & ENVIRONMENTAL ENGINEER MAY 2023 Read the latest at: www.bsee.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44