SAFETY, FIRE & SECURITY
Prevent costly battery failures before they happen
Unexpected battery failures can lead to costly downtime, compromised safety, and poor system performance – critical concerns in backup power and industrial energy storage applications. The key to preventing these issues? Proactive battery symmetry monitoring
• Preventive maintenance – Minimises downtime and extends battery lifespan by identifying voltage imbalances before they cause critical failures.
• No auxiliary voltage required – Simplifies integration into battery storage units.
• Time delay feature (10s) – Avoids false alarms, ensuring stable operation.
F
or example, DOLD’s BA9054 Battery Symmetry Monitoring devices deliver high-accuracy detection of voltage imbalances in battery systems with centre tapping. This helps design engineers and contractors optimise battery performance, extend lifespan, and prevent failures before they happen.
Typical connection diagram
Built for preventive maintenance, improved productivity, and full compliance with IEC/EN 60255-1, the BA9054 is a powerful, compact solution for safeguarding battery storage systems. Available in three configurations. The BA9054 is engineered for high-precision voltage detection, identifying imbalances with exceptional repeat accuracy. By detecting irregularities early, it enables engineers to take corrective action – reducing maintenance downtime, preventing system disruptions, and ensuring peak battery efficiency.
Where would I use battery monitoring?
Battery systems play a mission-critical role in energy storage, backup power. This includes UPS systems for data centres, hospitals and in-house IT depts – and other industrial applications. To prevent operational failures, voltage symmetry monitoring is essential.
Why voltage imbalance matters
In backup power systems composed of multiple battery packs, a single underperforming cell can reduce the total available energy. It can trigger shutdowns and compromise power delivery when it’s needed most. Worse still, it can dictate the reliability of the entire battery pack. This can lead to reduced efficiency or catastrophic failure.
The root of the problem?
Discharge limitation: Discharging must stop when the first cell – such as cell C – is depleted.
Designed for engineers, built for reliability
BA9054 is purpose-built for design engineers working in battery storage, renewable energy, and industrial power systems. By integrating this device into their designs, engineers can improve battery efficiency, prevent system failures, and optimise energy usage. This ensures a stable, reliable power supply is always available when and where it’s needed most.
This is essential even if other cells still hold charge. Continuing would damage the depleted cell and shorten overall battery life. Charging Limitation: Charging must stop when the first cell – such as cell A – reaches its maximum voltage. Exceeding this can lead to thermal runaway, posing a risk of catastrophic failure, including fire or explosion. Battery symmetry monitoring is essential for catching these issues before they cause lasting damage.
BA9054 – when performance counts
• Wide voltage compatibility – Supports battery voltages up to 300V DC, making it suitable for diverse energy storage applications.
• Precision voltage detection – Measures voltage ranges from 0.12V – 10V DC, enabling early detection of potential failures.
• Advanced safety & compliance – Meets IEC/EN 60255-1 standards, ensuring reliability in emergency power systems.
“In systems where just one cell can limit energy availability and jeopardise power delivery, the BA9054 empowers design engineers to add advanced battery health monitoring for reliable performance without complicating system design,” said Ian Holland, managing director. “With gold-plated contacts for reliable low-load switching, LED indicators for real- time feedback, and a compact 45mm width, it seamlessly integrates into existing battery management systems.”
Why use battery symmetry monitoring
24 BUILDING SERVICES & ENVIRONMENTAL ENGINEER JUNE 2025
Read the latest at:
www.bsee.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42