Adveco Hot Water Metering For Gas Replacement
T
he most consistent issue we see in commercial hot water systems is oversizing, whether through lack of understanding of application design or concerns over providing suitable back up to ensure system continuity. The
result of oversizing is however always the same, unnecessary capital costs for system supply and installation, and ongoing excess operational costs associated with higher energy demands and therefore greater carbon emissions. As companies seek to adopt greener building operations, replacing old gas-fired systems with like-for-
like electric is another guaranteed way to gain an oversized system, but can also lead to undersizing if storage is not large enough to account for low, slow heating associated with heat pump based electric systems. Getting that balance right is critical as per kW price of electricity remains much higher than that of gas. More importantly, if the new electric system is oversized the required amperage could exceed a building’s available electrical supply. Bringing new supply in means excavating, possibly as far as the substation, which will see cost soar, or even stall the project. This can best be avoided by understanding your actual hot water demands and designing the replacement so that it is optimised to meet the specific needs of the building, this is why accurate data is so valuable. To support commercial organisations intending to replace legacy gas systems with more sustainable electric applications Adveco has created a Live Metering service for domestic hot water (DHW) systems. Adveco Live Metering is a simple to install, non-invasive onsite process that generates consistent 24/7 data on existing hot water systems to accurately understand actual usage, including critical peak demands. Adveco’s specialist engineers will visit the site, providing an overall visual assessment, fit the meters and monitor for an agreed period, typically a month before returning to remove them. The data will then be processed, and a report generated with design recommendations for a replacement system that meets the exact needs of the building. Data collected with Adveco’s Live Metering Service has already enabled organisations to avoid excess capital costs whilst reducing emissions in line with decarbonisation strategies. It has demonstrated, for example, that a gas-fired hot water systems operating at 60 kW can be directly replaced by a system based around a smaller 12 kW ARDENT electric boiler and a cylinder optimised to meet storage requirements reducing carbon emissions by 2800 kg per annum. The demands of a system operating two 50kW gas-fired water heaters could be replaced with a 24kW electric water heater and heat pump supplying the preheat, reducing emissions by 5100 kg per annum. With both replacement designs rated at 120% they provide more than enough storage capacity to meet unexpected peak demands and carbon emissions are expected to continue to fall as grid electricity supplies continue to decarbonise in the future. By optimising the use of air source heat pumps, electric boiler and hot water cylinders, not only are capital investments reduced, but so too is the system size and complexity, making for easier installation and potential to recover valuable plantroom space. Should a business opt to purchase the recommended replacement system from Adveco they will receive a 50% refund on the cost of implementing the initial Live Metering service. Talk to Adveco or your regional sales representative about pricing and booking metering at your property.
https://adveco.co/
Auriga lights the way at Faraday Road Birchwood Park
L
uceco has recently supplied amenity street lighting to Faraday Road in Birchwood Park on the outskirts of Warrington. Over 160 businesses enjoy the convenient location of the business park situated in the centre of the North West of the country with excellent transport links.
Auriga is a highly functional yet contemporary post top luminaire suitable for a variety of applications offering 70,000 hours of operational life. Manufactured from high pressure die-cast aluminium, Auriga has an LED efficacy of up to 136 Llm/cW capable of producing up to 7950 luminaire lumens at 4000K with a CRI >70. Options include 22W - 60W variants, DALI dimming, optional photocell as well as Auriga being rated at IP66 and IK08. Andy Whalley, Luceco Project Manager said, “we worked directly with CBRE (commercial real estate services) and Brent Sansom at Lighting Design Services. Surveys were conducted over 2 nights at Faraday Road, with light meter readings taken over the roadway, verges and cycle paths. The lighting design aimed for 15 lux average 0.25uf on the roadway, 5 lux on the verges and cycle paths and the chosen post top fitting for this project was the Auriga from Kingfisher Lighting, part of the Luceco PLC Group.” Birchwood Park’s environmental strategy is committed to becoming Net Zero in all their managed
areas and buildings, including the road network within the business park. Installing cost effective, energy efficient street lighting on Faraday Road was an element of this objective. The installation contractors were Taylored Facilities Management based in Liverpool.
Advertorial Combi-what?
P
ress fittings have made life a bit easier for many installers, be it for drinking water, heating or gas. Piping system specialist SANHA takes this one step further with combipress. Their metallic fittings are designed in such a way that they can be pressed with different jaws and slings with original V
and M contours in addition to SANHA’s own contour. This function is called “combipress” by the manufacturer. It summarises three important advantages
of using SANHA, all designed to make installations simpler: Apart from Push & Stay and the Leak Path function for added safety, all metallic fittings up to and including 54 mm can be pressed with SA, V or M jaws (for their MLCP pipes and fittings, TH, B, F, H and U can be used). Larger dimensions which are not used as often can still be pressed with the SANHA and M profile. The benefit here is obvious – installers can use their existing tools and be safe in the knowledge that
the connection will do what it is expected to do. This applies to all metallic press fit series, such as the SANHA-Press Gas series. Here the manufacturer offers dimensions 12 – 54 mm which can be used with all copper pipes according to EN 1057.
www.sanha.com
Trousers that work as hard as you do – only from Snickers Workwear
W
www.luceco.com Read the latest at:
www.bsee.co.uk
ith as many as 40,000 stitches, and up to 64 pieces of fabric in a single pair of Snickers Workwear trousers, it’s little wonder they’re built to last and the preferred choice of discerning tradesmen and women.
Ergonomically designed for maximum comfort, freedom of movement and functionality, there’s
over 80 different styles and 71 different sizes in the Snickers Workwear Trouser system. So you will always find a pair to suit you. The men’s and women’s Trousers range includes full stretch slim fit styles plus street-smart regular and looser fits throughout the full LiteWork, FlexiWork, RUFFwork and AllroundWork trouser families. With at least 16 pocket compartments integral to every pair complimented by a choice of 8 different Kneepads, Snickers Workwear knows that your work trousers have to do a lot of things. Keep you comfortable, carry your essentials, and protect your knees and legs from debris and hazards in the workplace. So, whatever your trade, wherever you’re working and whatever your sustainability preferences are, you can be sure there is a pair of Snickers Workwear Trousers to suit you.
www.snickersworkwear.co.uk BUILDING SERVICES & ENVIRONMENTAL ENGINEER APRIL 2023 31
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40