Cases & enclosures
Fast enclosure customisation speeds up security project for utilities company
A
UK electricity utility company has been provided with 100 customised enclosures within two weeks of order. Industrial enclosure manufacturer, Spelsberg,
was able to provide a customised sample within an hour of request to Avanti Lighting, which had been contracted by the utility company to develop a weather-proof CCTV bracket and enclosure mounting system. Avanti Lighting supplies lighting and electrical products for commercial and industrial applications across the UK. Creating bespoke solutions for a range of largescale enterprises, Avanti Lighting was tasked by the electricity utility to develop a solution to mount and house swan neck CCTV cameras to be installed in outdoor locations at sites across the country. Avanti Lighting designed a bespoke corner
bracket to fit the installation specification, providing a powder coating to match the cameras. In addition to achieving the correct angular position for the bracket, as well as a durable design, the utility company’s main requirement was ease of installation and fast project completion. Avanti Lighting’s bracket design enabled direct installation of the camera with a cable access point in the exact required position. To house the cameras, the enclosure needed to be fully weatherproof and sufficiently robust. At the same time, the enclosure had to precisely fit the required cable entry point and be easy to install. The project also had a rapid deadline and as a result of previous project collaboration, Avanti Lighting turned to Spelsberg UK with its on-site, UK customisation facility to design and manufacture the bespoke enclosure. “For the customer, ease of installation was key, including an enclosure that would be supplied ready to mount, with all holes drilled for cable entry points. This would make the process as quick as possible for the utility’s engineers,” says Avanti Lighting’s general manager, Paul Vissani. “We knew that Spelsberg’s CNC capability meant rapid, accurate machining, provided
around a durable industrial enclosure.” To protect against all weather elements, an IP67
TG enclosure was selected, providing total protection against dust as well as water ingress, meaning that the camera would remain safe and dry when installed outside. Constructed from polycarbonate, the enclosures would also provide durability from impact and UV protection. Reviewing the utility customer’s requirements along with the design of the camera and the bracket, Spelsberg’s engineers developed the optimum method of enclosing the CCTV device. The enclosure had to provide a precisely positioned cable entry point, but, as the camera included a pre-terminated cable that would not physically fit through a compression gland that would normally be used, an alternative solution was required. As a result, Spelsberg’s design included CNC machining a groove in the enclosure that would both allow cable entry and maintain the high IP rating. With the enclosure lid removed, the camera could be installed with the cable inserted into the groove. Thanks to the precision of the machining, replacing the lid would form a tight and protected seal around the cable, preventing any dust or water ingress.
A critical factor for Avanti was speed of the process to meet the utility provider’s deadlines. Taking the initial requirements to Spelsberg UK, as a result of the on-site design and CNC capability a sample was provided to the customer within an hour. Spelsberg typically provides a sample within 24 hours, which can be a particular advantage over other UK enclosure suppliers that can take more than a week, especially if they do not have customisation facilities on-site. The customer confirmed the initial sample and the total order of 100 enclosures, all manufactured with CNC customisation, was completed within two weeks. “The reason we work with Spelsberg is that
they provide durable enclosures and they’re able to customise them to suit any application requirement,” says Vissani. “As this service is provided on-site, it invariably means a fast project completion.”
Spelsberg 14
www.spelsberg.co.uk January 2022 Instrumentation Monthly
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74