search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Water monitoring


FROM OBLIGATION TO OPPORTUNITY: USING DATA TO DELIVER AMP8 OUTCOMES


By Phil Collins, Development Director, Hydro International A


s the water industry moves into AMP8, the message from regulators is clear. Data is no longer something we collect simply to satisfy a requirement; it must be actively managed, analysed and acted upon. The pre AMP8 instructions within the Water Industry National Environment Programme (WINEP) reinforce this expectation, calling for stronger environmental understanding, better evidence and more informed operational decision making. For water companies, this presents both a challenge and an opportunity. Programmes such as sewer overflow reduction plans and Section 82 continuous water quality monitoring demand reliable, frequent, high quality data. That data needs to support regulatory reporting while also providing practical insight that engineers and operations teams can use every day. At Hydro International, we work alongside water companies to make this shift achievable. We have built a strong track record of monitoring installations across the UK, many of which are installed, managed and maintained by our nationwide services teams. These telemetered sites support a wide range of applications, from remote flood warning locations, natural flood management schemes and reservoir level monitoring to targeted spot flow and water quality surveys. Through accurate remote capture of water level, flow, weather and water quality data, we provide consistent, trusted datasets that support flood mitigation planning, water resource assessment and long-term environmental research.


46


Section 82 of the Environment Act raises expectations further, requiring continuous upstream and downstream monitoring of receiving waters around sewerage assets. Our Hydro Logic River Sentinel system has been developed specifically to support this duty, monitoring parameters including temperature, pH, dissolved oxygen, turbidity and ammonia at the required frequencies. This capability is underpinned by technology we have designed for real world deployment. Our Hydro Logic Flexi Logger 105 telemetry logger pairs with a wide range of sensors to monitor flow, level, weather and quality data. We have also developed the Hydro Logic Flexi Grit 30 sediment sensor, giving operators clearer visibility of sediment behaviour


within stormwater and wastewater systems. Data becomes truly valuable when it is accessible and understood. Our Hydro Logic Timeview time series platform and Hydro-Logic Aquator water resource software, support the conversion of complex datasets into clear, actionable insight.


If you would like to talk through your WINEP obligations, Section 82 monitoring plans or wider water management challenges, we are always happy to share insight, offer advice and help identify practical solutions.


Hydro International hydro-int.com/smart-monitoring April 2026 Instrumentation Monthly


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72