Test & measurement


overheating. As a result, it is just as important to assess the dielectric properties of the insulation to identify and predict early signs of insulation degradation prior to catastrophic failure. To do that, engineers can use dielectric


T


testing, a non-intrusive condition monitoring technique, which can be carried out as part of an inspection or planned overhaul. These tests are designed to assess the condition of a motor’s windings and to diagnose and predict any early signs of deterioration and aging. As a result, these tests allow operators to schedule repairs ahead of a failure, which can often be very costly and result in unplanned downtime.


STaTIC mOTOR TeSTIng To check the motor’s insulation system and give an overall picture of its health, static or offline testing is a good option. This is performed while the motor is not running and can be executed on site or in a specialised electric motor repair facility. These tests are routinely carried out to determine the integrity of the windings and demonstrate that a motor is correctly wound and insulated. On-site testing is routinely implemented


once or twice a year or during scheduled outages. Recommendations on how often tests are undertaken are based on a range of factors such as criticality, past history, size, repair costs, availability of spares, daily starts and stops, and ease of access, amongst others. Houghton International uses a Baker DX


series and 40kV power pack PP40 tester to apply a wide set of offline electrical tests to assess the condition of motors and coil windings. The Baker DX can find early indications of


insulation weakness and faults in windings, between phases, coil-to-coil and in groundwall insulation. The tests can identify if contamination is impacting insulation strength, as well as detect problems with connections such as feed cable insulation weakness, motor imbalances, open or high resistance. Houghton also offers periodic offline testing and trending of the motor’s insulation systems, on site or in the company’s workshop, to give an overall picture of motor insulation health. A complete diagnosis of the insulation


system also includes a winding resistance test, an IR meg-ohm test, a polarization test, a step-voltage or high potential test, and a surge test – all carried out using the Baker Tester. For higher voltage motors, 6kV and above, partial discharge testing can also be used to provide a wider picture of the asset’s health.


PaRTIal dISCHaRge High voltage equipment often suffers from partial discharge activity, where localised corona or breakdown discharge can damage insulation, leading to progressive degradation and eventual insulation breakdown. This type


42


he problems caused by insulation deterioration can be just as serious as those caused by worn bearings or


Static motor testing and


preventative maintenance One of the most common causes of electric motor failure is bearing issues, responsible for around 51 per cent of failures. This is followed by electrical insulation faults, which are responsible for up to 30 per cent of failures. But, while predictive maintenance techniques, such as vibration analysis, are often used to analyse the motor’s health, in comparison little is done to detect signs of insulation deterioration and failure. Here Houghton International’s Chris Robson discusses the importance of static motor testing for assessing the full condition of motors.


of issue would not be detected using standard diagnostic tests and it is even possible for a motor to appear healthy while having high levels of partial discharge. Compared with other dielectric tests, the differentiating character of partial discharge measurements allows localised weak and aged points of the insulation to be identified. Partial discharge testing and monitoring is


particularly important when the asset is critical to the operation of a network; this may be due to the asset’s age, past failures or the financial consequences of a failure. Partial discharge measurements based on IEC 60034-27 standards can be performed on motors and generators either online, during regular load service operation, or offline.


All tests should be carried out in


accordance with appropriate standards such as IEEE, IEC and EASA standard AR100-2105, which outlines recommended practices for the repair and therefore the testing of rotating electrical apparatus. Static motor testing enables machinery operators and plant owners to get a full picture of the motor’s health and to make informed decisions about their equipment’s future. Successful testing requires high quality, calibrated equipment and highly trained and competent engineers to provide quality results and reduce the downtime of the assets.


Houghton International www.houghton-international.com


April 2021 Instrumentation Monthly


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74