• • • TEST & MEASUREMENT • • • New battery test facilities for EV
Project BattCon is a pilot project introducing containerised battery test facilities, designed to help meet increasing demand for new UK-based battery testing to support EV supply chain and OEMs. The containers will be in operation at Lotus HQ in Hethel, Norfolk, plus the new Lotus Advanced Technology Centre in Wellesbourne, West Midlands and aims to provide a fast, cost-effective and efficient solution for companies developing new batteries
L
otus Engineering is launching a pilot containerised battery testing facility to assess energy storage solutions for the
booming EV sector. It will allow Lotus Engineering to carry out various battery cell, module and pack characterisation tests, performance evaluations, and component and lifetime testing under controlled conditions. Early feasibility study support and validation of mature designs for implementation into new vehicles will also be available.
The project has been named BattCon, an abbreviation of Battery Containerised Test Facility. The ‘containers’ are individual walk-in laboratories and will be in operation at Lotus HQ in Hethel, Norfolk, as well as the new Lotus Advanced Technology Centre in Wellesbourne, West Midlands. Each is the size of a standard 40ft shipping container and so can easily be packed up and transported as a mobile testing unit, available to Lotus Engineering customers wherever they are. Lotus has three operational units as part of the pilot scheme. For clients, Lotus Engineering will offer an EV safety-compliant workshop facility with specialist
staff experienced in testing batteries. Companies new to the EV field, and those who would otherwise need to invest in additional test facilities, will have access to a fast, efficient and cost-effective solution to develop new technologies and speed up their route to market. For Lotus itself, the new technology will support ambitious plans to launch a new range of performance vehicles. Lotus Engineering has a wealth of experience in the design and engineering of EVs and other alternative propulsion powertrains dating back two decades. While many of the programmes remain confidential, the consultancy’s work on the Tesla Roadster (2008-12) is the best-known example. Matt Windle, executive director, Engineering, Lotus, comments: “As the race intensifies for automotive and other sectors to develop new and novel battery technologies, there will be increased demand for suitable testing facilities. Project BattCon begins to address this problem by evaluating how Lotus Engineering can meet the battery testing opportunities for the UK supply chain and OEMs.” Services available include capacity determination, resistance mapping, current and
36 ELECTRICAL ENGINEERING • DECEMBER/JANUARY 2021
power mapping, open circuit voltage determination and heat capacity. Lifetime testing is comprised of low-voltage cycling, high-voltage cycling, self- discharge determination, storage ageing, cycle ageing, drive cycle ageing and orientation. One of the three Lotus containers features an ambient chamber, the temperature of which can be raised or lowered to replicate climatic extremes around the world.
The pilot project will conclude in spring 2021 and
is co-funded by the Automotive Transformation Fund (ATF), part of the Advanced Propulsion Centre (APC); Innovate UK, part of UK Research and Innovation; the UK Government’s Department for Business, Energy and Industrial Strategy (BEIS) and the Department for International Trade (DIT). Upon completion, the project will be evaluated and a decision taken about its future.
Lotus Engineering is the consultancy division of Lotus and provides a comprehensive range of technical services to many of the world’s best- known automotive manufacturers and suppliers.
LOTUS ENGINEERING
lotuscars.com/engineering
electricalengineeringmagazine.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52