• • • FUTUREPROOFING • • •
Office upgrade builds on CMD’s powerful legacy
‘Futureproofing’ is a term often used by consultants to reference a focus on ensuring that buildings can continue to adapt as technology and occupier requirements change, with as little disruption and expense as possible. In these volatile times, never has the concept been more relevant
A
recent project delivered by London-based electrical contractor, Bancroft Ltd, using products from CMD, highlights the
importance of selecting high quality products from a trusted manufacturer, along with choosing supply chain partners that can work proactively as an integral part of the delivery team.
Adapting the legacy system Located in the heart of the City, the project involved the refurbishment of a prestigious London office building for one of the world’s leading professional services firms. The client is based in offices spanning a total of 15 storeys across two towers and the initial plans for the refurbishment had focused on reconfiguration of the desk layouts to meet their revised requirements, along with upgrades to the interior fit out and finishes. The client’s intention had been to retain the
underfloor power distribution networks and focus the refurbishment on cosmetic upgrades to the office interiors, with Bancroft tasked with a light-touch electrical upgrade to include new lighting, kitchen areas and tea points, along with reconfiguration of power sockets for the new layouts. Ryan Collis, project director at Bancroft, said:
“The previous electrical fit out of the building had been specified and installed with flexibility and futureproofing in mind, with a powertrack power distribution network, which offered scalability and adaptability. “The legacy system was CMD’s AlphaTrak
powertrack, which had been installed 20 years earlier, and, when we tested it, the CMD power distribution system was still fully functional and compliant after two decades’ of use.
new interior layout so that the electrical upgrade could go ahead within the original timescale, while re-using the AlphaTrak system and delivering a compliant installation. Paul Allen, national sales manager (power
distribution) at CMD, said: “Without compatible new tap-offs to make the power distribution network compliant with current wiring regulations, Bancroft would have needed to take out the powertrack on every floor and install a new system, which would have meant a huge additional cost in terms of products, programme length and project scope. “We were able to adapt our compliant Betatrak
tap-off technology to fit the 20-year-old AlphaTrak installation, thereby minimising the impact on costs and programme delivery. And, because we manufacture in-house in the UK, we were also able to fast track the order, helping Bancroft to keep the project on track.”
“However, due to the publication of changes to
wiring regulations since the previous installation, the existing tap-off leads could not be re-used as originally planned, due to a lack of mechanical protection. We turned to CMD to help us find a solution that would enable the AlphaTrak system to remain in place and be re-used, while updating the tap-offs to deliver a compliant installation.” CMD’s AlphaTrak powertrack system has been
discontinued and replaced by the company’s Betatrak powertrack system since the power distribution networks were installed in the two office towers. However, CMD was able to custom- design and manufacture 3,000 new tap-offs for the
Joined-up supply Alongside the new tap-offs, CMD also supplied new grommets, cleaner’s hives, lighting hives
and the company’s fast-fit 20 Series floor boxes, which provide ease of access to power sockets and data. CMD also supplied the Rotasoc modular
workstation power system for the project, which was configured to accommodate the sit/stand desks specified for the new office environment. A 2 gang Rotasoc module with RCD protection was specified for the lower tray of each workstation, with a two metre connector lead to a 4 gang Rotasoc module on the upper tray. In this way, the lower tray module provides RCD protection for the entire workstation, and desk height can be adjusted easily to meet the needs of each user, without any restriction. As many of the occupier’s team are still working
from home, Bancroft has been able to carry out the installation in two phases. All office-based staff were relocated to a single tower to provide vacant possession of the other tower for refurbishment, and then decanted across while the second tower is completed. Mr Collis added: “We completed the west tower
by the end of 2021 and are now working on the east tower. Close collaboration with CMD means that we have been able to call down the products we need for each phase in real time as the project progresses. “CMD has aligned their manufacturing
schedules for the custom-manufactured tap-offs to our programme requirements, which has helped us schedule work aligned to the client’s expectations.”
36 ELECTRICAL ENGINEERING • APRIL 2022
electricalengineeringmagazine.co.uk
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44